SOP-42Q-MES0049 SMT Part Traceability

From 42Q
Revision as of 16:33, 21 January 2014 by Dane parker (talk | contribs)
Jump to navigation Jump to search

EZ Picklist

Convert SMT Program to Picklist

Figure 1: Convert SMT Program to Picklist – Main Menu

Convert SMT Program to Picklist-Main Menu.jpg


  1. Select “EZPicklist” menu under “SMT Machine” main functional module.


Select SMT Program File

Figure 2: SMT Program File Selection Window

SMT Program File Selection window.jpg


  1. Click “Select Picklist” button to locate the desired material placement file.
  2. Select the SMT program file name. Please refer to SMT job profile which prepared by SMT Engineer for the file name for each

SMT machine.

  1. Click “Open” button. Details of the picklist will be shown.

Figure 3: Full Picklist Details Window

Full Picklist Details Window.jpg

All SSCI part number, station, feeder, count, and designator are encoded in SMT placement program which were prepared by

SMT Engineer.


Material(s) Selection for Traceability in EZ-Picklist

Figure 4: Material(s) Selection Option in EZ-Picklist

Material Selection Option in EZ-Picklist.jpg


  • Select the 1st production side and/or 2nd production side (as per picklist setup for production environment):
  • In case the selected picklist is intended for a double-sided board which have one or multiple common materials in both sides,

refer to green-framed items in below figure, there are 2 items of the same Part Number in the picklist, which means, this is a

double-sided board, side 1 and side 2 have one common material.

  • To make no confusion during the production for such boards, we need to configurate which item needs to be used in which

side. As common material items share the same part number but match with different board numbers,  we can simply

match board numbers with sides to realize the configuration of items to sides.

Figure 5: Double sided board with the same material handled in the same station

EZpicklist - common material.png

  • Click on 1st Side or 2nd side option in this instance, a dialog box like below will prompt:

Figure 6: Board number confirmation

EZpicklist - Confirm board number on a side.png

  • This dialog box allows user to perform board-number-to-side mapping for common material(s). There will be 3 options

available in the drop-down list, refer to below figure:

EZpicklist - Confirm board number drop-down list.png

  • Board Number Goup 1:  Board numbers of one side, auto detected and grouped by system.  For normal panel

production(with all boards up or down), user can select this one.

  • Board Number Group 2: Board numbers of the other side, auto detected and grouped by sytem. For normal panel

production(with all boards up or down), user can select this one.

  • All Boards:  With all board numbers included, that is to say,  boar number group 1 plus board number group 2.

This option is designated for mirror-board production, with some boards up and some boards down and all are populated at

the same time.

  • Simply select an option as per actual production and click on OK to confirm. Take note that board numbers for the other side

will therefore be confirm and no further confirmation needed once one is done.

  • In case the selected picklist is for single-sided board, no confirmation is needed and system will simply check materials for

the selected side as per default configuration.


  • Select the High Value option, Lead Free option checkbox associated to each individual material part number if required.

Figure 7: Material(s) Sending Option in EZ-Picklist

Material Sending Option in EZ-Picklist.jpg 

  1. Click “Send” button to send the picklist to PTS server.


Confirm the Picklist Successfully Generated

Figure 8: Successful Prompt upon Completed Picklist Conversion

Successful Prompt upon Completed Picklist Conversion.jpg


  1. After the picklist is submitted to server, message prompt “Complete” will display as shown in Figure 6.
  2. Click “Confirm” button to confirm it.


Generate Loading List

Figure 9: Loading List Option in EZ-Picklist

Loading List Option in EZ-Picklist.png


  1. Click “Loading List” button to send the picklist to default path: C:\pts\loadinglist\ (Windows); /temp/loadinglist (Linux) .

Note: 

  • Default path for Loading List report is customizable. Local plant can simply contact PTS team to do the

customization.  

  • There are two available templates for Loading List report, refer to below Template 1 and Template 2. Template 1 is the

default one, local plant can also contact PTS team to switch to Template 2.

Figure 10: Available Loading List templates

Defaultloadinglistreport.png

Loadinglistreport2.PNG

Template 1(Default) Template 2(Adding Nozzle Info)

Please be noted that this Surface Mount Devices (SMD) Loading List cannot be used as a control document without stamp/sign

by authorized personnel defined by plant such as SMT production line supervisor/team leader. This is designed to be used for

materials loading reference only.


Figure 11: Confirm the Loading List Successfully Generated

Confirm the Loading List Successfully Generated.jpg


  1. After the Loading list is generated successfully, message prompt “Complete” will display as shown in Figure 8.
  2. Click “Confirm” button to confirm.


SMT Comparison

This module is designed to compare standard SMT program and current SMT program, which makes it easy for user to find out

the differences between two programs and eases the operation.


SelectSMT Comparison from the main menu of PTS Web, a window shows up, refer to below figure:

SMT Comparison.png

All available SMT machines are shown in tabs and there are two grids displayed under each tab for user to make comparison

the programs of the selected machine type:

  • Select correct machine tab.
  • Click Standard SMT button, system will pop up one dialogue box asking user to select one file (make sure the file user

selected matches with machine type)

  • Then click Current SMT button, select current SMT program for comparison.
  • After both program selected, system will compare them and show differences to user. Refer to below figure:

SMT comparison results.png

  • As above shown, the modified value is marked with red in Current SMT table.Corresponding checkbox for the item will be

ticked automatically.

  • Designator:  List out designators that has been modified.
  • Modified: Display original data and new data. (E.g. X_Axis: -69.93/-69.9, ‘-69.93’ is original data, ‘-69.9’ is new data.)
  • Click Comparison Report button, a report will be generated under C:\pts \report to log what has been changed .


SMT-BOM Comparison

This function is used to compare picklist whether existing in BOM file.


Select SMT & BOM Comparison from the main menu of PTS Web, a window shows up, refer to below picture:

SMT and BOM comparison-1.png

  • Click SMT File button, system will pop up one dialogue box asking user to select appointed Ezpicklist file.
  • Input correct BOM part number into BOM P/N text box, then press Enter key.
  • Select correct ECN number from pull down list.
  • Click Check BOM button. If there is any error record in BOM file, the error message will show in the table right below, refer to

below picture:

SMT & BOM comparison-2.png

  • Click on Report button, an EZpicklist excel file will be automatically genterated and saved under the default path:

C:\pts\report.

Show BOM

This module allows user to view BOM, disable BOM or enable BOM.


Select Show BOM from the main menu of PTS Web, below picture shows up:

Show bom-1.png

  • All BOM P/N(ECN) in the system are listing out in pages.
  • User can search a BOM by BOM P/N or BOM ECN, and/or by Active or Disabled.
  • Right click one selected item, a menu will be shown(refer to above figure):
  • Disable: Allow user to disable the selected BOM P/N or BOM ECN.

(Note: on online ECN can't be disabled and system will prompt a warning message accordingly)

To enable a disabled BOM, user can:

1. Search the BOM by Disabled and click on Go button, all disabled BOM will be displayed;

2. Right click on target BOM and select Enable.

  • Deviation: This option redirects to Deviation Note Report page and allows user to add or review the deviation records.
  • Show BOM: This option allows user to view all existing items under the selected BOM. Refer to below figure:

Show BOM-2.png

1. Click Send button, system will redirect to File Archive page which allows user to export the BOM.

2. Cancel takes user back to previous page.



Compare BOM and Picklist

This module is designed to verify if designators in BOM are consistant with the ones in SMT program and list out the

differences.


Select Compare BOM and Picklist from the main menu of PTS Web:

Compare bom and picklist-1.png

Currently, system provides two methods to search comparison results. Search by Line Name or Picklist Name. Details are

explored below:

Search By Line Name

  • Input Line Name
  • Input BOM number into BOM textbox
  • Select correct BOM ECN from BOM ECN drop-down list.
  • Click Check button. The results will be shown on the right. Above figure is an example of unmatched results.
  • If BOM match with Picklist, screen will show as the following.

Compare bom and picklist-2.png

Note: Pay attention to Compare Part Number check box. This option is meaningless if user choose to search by Line

Name.


Search By Picklist Name

  • Select and input Picklist Name
  • Input BOM number in the BOM textbox
  • Select a correct BOM ECN from the drop-down list
  • Click on Check button.

Note: Pay attention to the Compare Part Number check box here, the result shown on the right will be of slight

difference with this option checked and unchecked. Refer to below figures:

Compare Part Number Checked Compare Part Number Unchecked

PN Extra Info

This module allows user to flag the high value material and define whether or not to track and show orientation picture for a

particular material during the process of material loading.

Prerequisites:

  • Please sent " Track all Components=Yes " under System Setting page on PTS Web.


Select PN Extra Info from the main menu of PTS Web, below picture shows up:

PN Extra Info-1.png

  • User can perform search by inputting target part number and/or defining parameters (Orientation, Track, High Value);
  • Select one item and click on its part number, a window will pop up, refer to below figure:

PN Extra Info-2.png

  1. Part Number: The part number selected by user. Display only.
  2. Description: Description of the item selected by user. Display only.
  3. Orientation: Whether or not to show the orientation picture when loading this material. select Yes or No.(Note: This

option will be disabled only when " Show Orientation Picture=Yes" under System Setting page.

  1. Track: Whether or not to track the material. Select Yes or No.
  2. High Value: Define whether or not the selected item is a high value item. Select Yes or No.(Note: This option will be

disabled only when "High Value Mark=Yes" under System Setting page.

  1. Send: Click this button to save the configuration.
  2. Cancel: Click this button to go back to previous window without saving.



Feeder Registry

Supervisors and administrators can create, change, and review history using the Feeder Registry portlet:

Creating a New Feeder

  1. In the Feeder Registry portlet, click Create Feeder.
  2. In the Create Feeder pop-up window, Select the Feeder Type, enter the new Feeder Barcode, and the Number of Feeder(s). Then click Create.
  3. Enter the Feeder Name in the Search text field and click the search icon to search. The new Feeder should now display in the search results.

Deleting a Feeder

  1. Enter the feeder barcode into the Search field and click the search icon to pull up the feeder in the search results.
  2. Check the box of the feeder.
  3. Click Delete.

Feeder Rework

Supervisors and administrators can rework feeders by using the Feeder Rework portlet by following the instructions below:

  1. In the portal, access the Feeder Rework portlet: Production > SMT Machine Part Traceability > Feeder Rework.
  2. Enter the full feeder name or scan feeder barcode then press enter or click on the next field.
  3. Change the maximum usage depending, maintenance period, minimum alarm usage and minimum alarm usage and minimum alarm maintenance period on feeder status.
  4. Click Add on the right panel.
  5. Key in Service Description then click Create on the call out page.
  6. Click Cancel button on the call out page.
  7. Select the Service Description from the drop down list, key in Remark then click Send on the right panel.
  8. Click Refresh.
  9. Click Print. Then click the ? on the left panel.

Feeder Type Registry

Supervisors and administrators can create, change, and review the feeder type history by using the Feeder Type Registry portlet.

Creating a New Feeder Type

  1. From the Feeder Type Registry portlet, click Create Feeder.
  2. In the Create Feeder pop-up windown, enter Feeder Type, Feeder Barcode, and Number of Feeder(s). Then click Create.
  3. Enter the apropriate values in the Type Regulation, Max. Usage, Maintenance Period, Min. Alarm Usage, Min. Alarm Period fields. Click Update.


Changing a Feeder Type

  1. Search for the feeder type to be changed by entering the feeder type or barcode into the search field and clicking the search icon.
  2. From the search results, check the box of the feeder type to be changed. Click Update.
  3. The Max. Usage, Maint. Date, Full Maintenance Date, and Maint. Period fields can now be changed.
  4. After the changes have been made, click Update.

Workstation Type

JIG Registry

Machine Registry