How to manage Calibration in CMMS

From 42Q
Revision as of 06:22, 15 August 2023 by Helena wang (talk | contribs)
Jump to navigation Jump to search

Prerequisites

  • Groups are defined (Shop Floor Control > Configuration > CMMS Admin > Group)
  • Calibration Assignment/Calibration Notification Categories are selected for the Group (Shop Floor Control > Configuration > CMMS Asset > Group > Assign Group > Category. Can also be accomplished when Group is defined).
  • Asset is created (Shop Floor Control > Configuration > CMMS Asset > Asset)

Configure the Calibration Groups

  1. Select the Asset to be calibrated.
  2. Go to: Group ICON
  3. At the GROUP LIST tab, select ASSIGN GROUP.
  4. SelectCalibration Assignment from Category drop-down at the top bar to search the associated groups.
  5. Select the Groups to which the Technician belongs. 
  6. Select the CategoryCalibration Notification.
  7. Select the Group to which the Approver belongs so the users receive email notification.

Figure 1: Assign Group 

1 Group.png

Figure 2: Default  Group

Add group user.png

 

Configure the Calibration Fields.

  1. Select the asset at the Asset Page, the Calibration icon show.
  2. At the Asset’s Calibration pop-up window.
  3. Complete the following mandatory fields:
  • Calibration Needed checkbox.
  • Last Calibration Date
  • Interval (mth)
  • The system will populate the Next Calibration Date based on the Last Calibration Date and the number of months selected in the Interval section.
  • Grace Period(Days).
  • Needs Approval
  • Approval User
  1. Complete the other optional fields if needed.
  2. Save.

Figure 3: Edit Asset Calibration Fields

Calibration tab.png

 

Complete the Calibration on the Asset

  1. Go to:Production > CMMS > Calibration > My Assigned.
  2. Double click on the Asset Name.
  3. Fill out the following mandatory fields:
  • Input Status
  • Actual Calibrated Date

Note: Only the Input Statu be set to Complete - Approval, this calibration Asset’s go to the approval process.

  1. Fill out other optional fields if needed.
  2. Save.

Figure 4: Calibration Assigned

Calibartion Assigned.png

  1. Email notification goes to the Approver and the assigned group members (this person was selected when the Calibration needs approver) (Step 2).

 

Approve (or Reject) the Calibration

  1. Go to: Production > CMMS > Calibration > My Approvals.
  2. Double click on the Asset Name.
  3. Complete the following mandatory fields:
  • Input Status: Select Approved or Rejected.
  • Actual Calibration Date.
  1. Save.

Figure 5: Calibration Approval

Calibration approval.png

Email notification goes to the approver, requester, and assigned group members.

 

 

Reschedule the Calibration

  1. Go to:Production > CMMS > Calibration > My Rescheduling.
  2. Double click on the Asset Name.
  3. Complete the following mandatory fields:
  • Rescheduled Date.
  1. Save.

Figure 6: My Rescheduling

Calibration rescheduled.png