42Q-MES0182-A Labor Maintenance

From 42Q
Revision as of 19:29, 14 February 2023 by Marisol vargas (talk | contribs)
Jump to navigation Jump to search

42Q Home > Shop Floor Control > Configuration > Labor Maintenance

 

 

Shop Floor Control
Configuration
Labor Maintenance
Version MES 15.76
Revision A1


 

 

Introduction 

 Labor Maintenance is an Administrative driven portlet, which allows to change and modify the time registered by the operators tracked in Production Workbench and OEE Workbench. 

 

Prerequisites

In order to use this portlet, a shop order has to be scanned in Production Workbench or OEE Workbench so that it can be reflected in Labor Maintenance. After the shop order is scanned it will be shown on the main page of this portal for the user to select.

 

Navigation 

To access Labor Tracking Maintenance go to: Shop Floor Control > Configuration > Labor Maintenance

 

 

Figure 1: Labor Maintenance