How to manage Calibration in CMMS
Revision as of 17:45, 12 August 2020 by Marisol vargas (talk | contribs)
Contents
Configure the Calibration Group
- Go to: Shop Floor Control > Config > CMMS Admin > Group.
- Add a new Calibration Group or edit an existing Calibration Group.
- Select the Calibration Categories at the General tab as needed.
- Go to the Users tab and add Users one at a time.
Screenshot: Set Group Category
Screenshot: Add Group’s Users
Assign the Calibration Group to Assets
- Go to: Shop Floor Control > Config > CMMS Asset and select the Asset to edit .
- Add Calibration Categories to this Asset's Group:
- Go to Group Tab.
- Add Calibration Categories one at a time.
Screenshots: Set Calibration Category
Screenshot: Set Group for Asset
Assign the Calibration.
- At the Edit Asset Page,move to the Asset’s Calibration Tab.
- Complete the following mandatory fields:
- Calibration Needed checkbox.
- Last Calibration Date
- Interval (mth)
- system will populate Next Calibration Date based on the Last Calibration Date, and the number of months selected in the Interval section.
- Grace Period(Days).
- Complete the other optional fields if needed.
- Save.
Screenshot: Edit Asset Calibration Tab
- Email notification goes to the Assigned group members, including Requester and Approver.
Screenshot: Assigned Alter Email
Complete the Calibration on the Asset
- Go to:Production > CMMS Calibration > My Assigned.
- Double click on theAsset Name.
- Fill out the following mandatory fields:
- Input Status
- Actual Calibrated Date
Note: Only the Input Statu be set to Complete - Approval, this calibration Asset’s go to the approval process.
- Fill out other optional fields if needed.
- Save.
Screenshot: Calibration Assigned
- Email notification goes to the Approver and the assigned group members (this person was selected when the Calibration need approver) (Step 2).
Screenshot: Status Change alter Email
Approve (or Reject) the Calibration
- Go to: Production > CMMS Calibration > My Approvals.
- Double click on the Asset Name.
- Complete the following mandatory fields:
- Input Status: Select Approved or Rejected.
- Actual Cal Date .
- Save.
Screenshot: Calibration Approval
- An email notification goes to the approver, requester, and assigned group members.
Screenshot: Approval Alter Email
Reschedule the Calibration
- Go to:Production > CMMS Calibration > My Rescheduling.
- Double click on the Asset Name.
- Complete the following mandatory fields:
- Rescheduled Date.
- Save.
Screenshot: My Rescheduling
Revision Log
Revision | Revision Date | Description | Updated by | Approved by |
---|---|---|---|---|
1 | 12/19/18 | Initial Draft | Martha Jordan | |
1 | 4/11/19 | Update screenshots. Correct some mandatory fields Add Reschedule section | Helena Wang | |
2 | 8/12/2020 | Title Update | Elaine Fonaro | |
2A | 8/12/2020 | Revision Log Update | Marisol Vargas |