The Material Report portlet can be used to display reports that show Create Date, Barcode, Rec. No., SANM P/N, MSL, Cur. Qty, Lot Code, Date Code, Expire Date, When Used, Manufacturer PN, Vender Code, and Supplier Name information. To view the report,
 +
 +
#Navigate to the Material Report portlet ('''Reporting > Part Traceability > Material Report''').
 +
#Set Search By option using the dropdown menu.
 +
#Depending on the Search By option selected, enter Start Date and Stop Date into their respective fields. Otherwise enter the number
 +
#Enter Lot Code or Date Code.
 +
#Click the search icon.
 +
#
  
 
== Receipt Traveler Report  ==
 
== Receipt Traveler Report  ==
Line 57: Line 66:
 
== Replace Barcode Report  ==
 
== Replace Barcode Report  ==
  
== Prepare Material Report ==
+
== Prepare Material Report ==

Revision as of 18:43, 22 January 2014

Board in Production

The Board in Production portlet can be used to display reports of boards in production. To view the report, follow the instructions below:

  1. Navigate to the Board in Production portlet (Reporting > Part Traceability > Board in Production).
  2. Enter either the production name in the Production Line field or the serial number in the Serial Number field.
  3. Select the Start Date and the duration of time for the report.
  4. Click the search icon.
  5. Board in Production report information should now displayed.


Board in Model

The Board in Model portlet can be used to display reports of boards in modeling. To view the report, follow the instruction below:

  1. Navigate to the Board in Model portlet (Reporting > Part Traceability > Board in Model).
  2. Enter either the production name in the Production Line field or the serial number in the Serial Number field.
  3. Select the Start Date and the duration of time for the report.
  4. Click the search icon.
  5. Board in Model report information should now be displayed.


Board in Work Order

The Board in Work Order portlet can be used to display reports of boards in work order status. To view the report, follow the instructions below:

  1. Navigate to the Board in Model portlet (Reporting > Part Traceability > Board in Model).
  2. Enter either the production name in the Production Line field or the serial number in the Serial Number field.
  3. Select the Start Date and the dration of time for the report.
  4. Click the search icon.
  5. Board in Work Order report information should now be displayed.


Board History Report

The Board History Report portlet can be used to display reports that show the Production Line, Workstation, Scan Time, and Scanned By information for a given board. To view the report,

  1. Navigate to the Board History Report portlet (Reporting > Part Traceability > Board History Report).
  2. Enter the serial number in the Input Board Barcode field.
  3. The Board History Report information should now be displayed.

 

Material Report (PTS)

The Material Report portlet can be used to display reports that show Create Date, Barcode, Rec. No., SANM P/N, MSL, Cur. Qty, Lot Code, Date Code, Expire Date, When Used, Manufacturer PN, Vender Code, and Supplier Name information. To view the report,

  1. Navigate to the Material Report portlet (Reporting > Part Traceability > Material Report).
  2. Set Search By option using the dropdown menu.
  3. Depending on the Search By option selected, enter Start Date and Stop Date into their respective fields. Otherwise enter the number
  4. Enter Lot Code or Date Code.
  5. Click the search icon.

Receipt Traveler Report

Material on Hold

Break Panel Query

Load Material Report

Replace Barcode Report

Prepare Material Report