Difference between revisions of "SOP-42Q-MES0024 Traceability Setup"

From 42Q
Jump to navigation Jump to search
 
(51 intermediate revisions by 7 users not shown)
Line 1: Line 1:
<small>[http://hsvmeswiki.sanmina-sci.com/mes_wiki/index.php/Cirrus#Categories Cirrus] &gt; [http://hsvmeswiki.sanmina-sci.com/mes_wiki/index.php/Shop_Floor_Control Shop Floor Control] &gt; [http://hsvmeswiki.sanmina-sci.com/mes_wiki/index.php/Production_Control Production] &gt; Production Setup</small>
 
  
<br>  
+
<small>[[42Q_Cloud-Based_MES/MOMS|42Q Home]] > [[Shop_Floor_Control|Shop Floor Control]] > [[Production_Control|Production Control]] > Traceability Setup</small><br/> &nbsp;
  
[[Image:Sanmina logo.png|130px|Sanmina logo.png]]
+
&nbsp;
  
<br>
+
&nbsp;
<center>'''PTS''' </center> <center>'''PTS Production Setup''' </center> <center>'''Version MES15 Portal 1.0''' </center> <center>'''Work Instruction''' </center>
 
<br>
 
<center>This Work Instruction is Sanmina's corporate standard.</center> <center>This document is under revision control. The latest revision is located on SanminaNet.</center> <center>Once printed it is an uncontrolled copy. All alterations to this work instruction require approval.</center> <center>Contact the IT Global Education and Training Department to submit suggested alterations and or updates.</center>
 
''This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.'''
 
  
== SFDC Production Control  ==
+
&nbsp;
 +
<center>&nbsp;</center> <center>'''Traceability Setup'''</center> <center>'''Version MES 15.77'''</center> <center>'''Revision E1'''</center> <center>&nbsp;</center>
 +
&nbsp;
  
The Shop Floor Data Collection System (SFDC) communicates interactively with the Customer Order Processing System (COPS), and Statistical Process Control/Statistical Quality Control (SPC/SQC). The Manufacturing Data System (MDS) makes the communication between these systems possible.
+
&nbsp;
  
SFDC provides real-time information used by SPC/SQC and MESWeb to create quality control reports. The data configuration for SFDC PC is handled within the Manufacturing Data System (MDS), which is a complete factory automation system. The SFDC System uses barcode scanning, both manual and automated, to monitor and control a single product line or an entire plant. SFDC Configuration collects data, provides analysis, maintains unit histories, and controls product movement on the manufacturing floor.
+
&nbsp;
  
The system provides Access Control between the modules of the application, including the functionalities of each screen. The current version has an SFDC Configuration page which provides access to all sub modules pages and its functionalities (view, add, edit, delete, print and generate output file).
+
#
  
'''General Notes'''  
+
= <span class="mw-headline" id="Introduction">Introduction'''&nbsp;'''</span> =
  
*This Work Instruction is a basic general training guide and is not meant to teach the process flow for individual plant or department functionality. Individual Sanmina sites may have minor or specific process changes that will be documented at the site level.
+
This system is designed to collect data from the shop floor and store it in the Manufacturing Execution System (MES). The collected information is used by the Reporting and MESWeb modules to generate quality control reports. The system utilizes both manual and automated barcode scanning techniques to monitor and collect data for a product line or plant. Its primary role is to maintain unit histories and direct product movement on the manufacturing floor.
  
'''Assumptions'''
+
&nbsp;
  
*Availability of SMT material placement program (e.g. Fuji SMT job program) or Hand load material placement (e.g. Material items and associated reference designator under Hand load operation).
+
== <span class="mw-headline" id="Access_Control">Access Control</span> ==
*Serial number printed on board prior SMT and/or Hand load operation process.
 
*Each SMT machine has been assigned a unique name for identification purpose. (i.e. Workstation name)
 
  
'''Prerequisites'''
+
The system provides access control between its various modules and screens, ensuring that users can only access the functionalities relevant to their roles. In the current version, the SFDC Configuration page acts as a central hub, providing access to all submodules and their respective functionalities, such as viewing, adding, editing, deleting, printing, and generating output files.
  
1. Understand PTS terms definition from Glossary '''SOP-5-I-MES0042-C_RA_PTS GLOSSARY'''
+
&nbsp;
  
2. Complete the PTS Getting Started – Basic Navigation Work Instruction, '''SOP-5-I-PTS0001'''
+
== <span class="mw-headline" id="General_Notes">General Notes</span> ==
  
3. Pick List has been obtained from plant engineering and uploaded into PTS, for EZ-Pick List – Refer to '''SOP-5-I-PTS0014'''
+
This user manual serves as a general training guide and does not cover the specific process flows of individual plants or departments. It is important to note that certain 42Q sites may have minor or specific process changes, which will be documented at the site level for reference.
  
'''Overview'''
+
&nbsp;
  
This overview explains the process for production setup in PTSWEB base on the following two different production setup scenarios:
 
  
'''Scenario 1'''
+
== <span class="mw-headline" id="Assumptions"><span class="mw-headline" id="Assumptions">Assumptions</span></span> ==
  
Production Setup for a new (or previous built) product item on a new shop floor production line, suggested following the steps below in PTS:  
+
Before using the Traceability Production Control system, the following assumptions should be considered: &nbsp;
  
{| width="100%" cellspacing="0" cellpadding="4" border="2"
+
*Availability of SMT Material Placement Program: Ensure that the appropriate SMT material placement program (e.g., Fuji SMT job program) or Hand load material placement (e.g., Material items and associated reference designator under Hand load operation) is available.
 +
*Serial Number Printing: Verify that a serial number is printed on the board before undergoing SMT and/or Hand load operation processes.
 +
*Unique Names for SMT Machines: Assign a unique name to each SMT machine for identification purposes. These names will be used within the system to track and manage the production process.
 +
 
 +
== <span class="mw-headline" id="System_Setup_Scenarios"><span class="mw-headline" id="System_Setup_Scenarios">System Setup Scenarios</span></span> ==
 +
 
 +
This overview describes the production setup process in PTSWEB based on two different scenarios:
 +
 
 +
*
 +
'''Scenario A: '''Production Setup for a new (or previously built) product item on a new shop floor production line
 +
 
 +
 
 +
Suggested steps are described in&nbsp;[https://42qrpt1.42-q.com/mes_wiki/index.php/SOP-5-I-42Q-MES0049-C_RA1_SMT_Part_Traceability 42Q-MES0049-C&nbsp;SMT Part Traceability.]
 +
 
 +
{| border="2" cellpadding="4" cellspacing="0" style="width: 904px;" width="100%"
 
|-
 
|-
| 1.<br>Convert and upload SMT Picklist into PTS.  
+
| style="width: 436px;" | 1. Convert and upload SMT Picklist into PTS.
| ''Refer SOP-5-I-PTS0014, Define EZ Pick List.''
+
| style="width: 444px;" | &nbsp;
 
|-
 
|-
| 2.<br>Create a New Production Line.  
+
| style="width: 436px;" | 2. Create a New Production Line.
| ''Refer to 2.1 Create a New Production Line.''
+
| style="width: 444px;" | ''Refer to Create a New Production Line.''
 
|-
 
|-
| 3.<br>Create all required Workstation(S).  
+
| style="width: 436px;" | 3. Create all required workstations (S).
| ''Refer to 2.5.1 Create a New Workstation.''
+
| style="width: 444px;" | ''Refer to Create a New Workstation.''
 
|-
 
|-
| 4.<br>Add the Workstations into the Production Line by sequence.  
+
| style="width: 436px;" | 4. Add the Workstations into the Production Line by sequence.
| ''Refer 2.6.1 Add a Workstation into a Production Line.''
+
| style="width: 444px;" | ''Refer to Add a Workstation into a Production Line.''
 
|-
 
|-
| 5.<br>Define Workstation Process Sequence in a Production Line.  
+
| style="width: 436px;" | 5. Define Workstation Process Sequence in a Production Line.
| ''Refer to 2.7 Workstation Sequence.''
+
| style="width: 444px;" | ''Refer to Workstation Sequence.''
 
|-
 
|-
| 6.<br>Define Workstation Parameters for each added Workstation(s).  
+
| style="width: 436px;" | 6. Define Workstation Parameters for each added Workstation(s).
| ''Refer 2.8 Workstation Setup.''
+
| style="width: 444px;" | ''Refer to Workstation Setup.''
 
|-
 
|-
| 7.<br>Define Picklist for each above added Workstation(s).  
+
| style="width: 436px;" | 7. Define Picklist for each above-added Workstation(s).
| ''Refer 2.9 Define Picklist.''
+
| style="width: 444px;" | ''Refer to Define Picklist.''
 
|-
 
|-
| 8.<br>Define Auto-Scan Mapping. (Optional)  
+
| style="width: 436px;" | 8. Define Auto-Scan Mapping. (Optional)
| ''Refer 2.10 Location Mapping.''
+
| style="width: 444px;" | ''Refer to Location Mapping.''
 
|-
 
|-
| 9.<br>Set Production Online.  
+
| style="width: 436px;" | 9. Set Production Online.
| ''Refer 2.11 Set Production On/Off-Line.''
+
| style="width: 444px;" | ''Refer to Set Production On/Off-Line.''
 
|}
 
|}
  
'''Scenario 2'''
+
&nbsp;
  
Production Setup for a previous built production item on where previous built shop floor production line, suggested to follow the steps below in PTS:
+
*'''Scenario B: '''Production Setup for a previously built production item on was previously built shop floor production line.
  
{| width="100%" cellspacing="0" cellpadding="4" border="2"
+
Suggested&nbsp;steps are described n [https://42qrpt1.42-q.com/mes_wiki/index.php/SOP-5-I-42Q-MES0049-C_RA1_SMT_Part_Traceability 42Q-MES0049-C SMT Part Traceability.]
 +
 
 +
{| border="2" cellpadding="4" cellspacing="0" style="width: 912px;" width="100%"
 
|-
 
|-
| 1.<br>Convert and upload SMT Picklist into PTS.  
+
| style="width: 440px;" | 1. Convert and upload SMT Picklist into PTS.
| ''Refer SOP-5-I-PTS0014, Define EZ Pick List.''
+
| style="width: 447px;" | &nbsp;
 
|-
 
|-
| 2.<br>Define Picklist for each Workstation which corresponding to the associated Production Line.  
+
| style="width: 440px;" | 2. Define Picklist for each Workstation that corresponds to the associated Production Line.
| ''Refer 2.9 Define Picklist.''
+
| style="width: 447px;" | ''Refer to Define Picklist.''
 
|-
 
|-
| 3.<br>Set Production Online.  
+
| style="width: 440px;" | 3. Set Production Online.
| ''Refer 2.11 Set Production On/Off-Line.''
+
| style="width: 447px;" | ''Refer to Set Production On/Off-Line.''
 
|}
 
|}
  
NOTE''':'''  
+
<u>'''Note 1:'''</u>&nbsp;This work instruction is a general training guide and is not intended to provide a shop floor production process flow for all individual plants or departments.
  
As this work instruction is a general training guide and this is not to provide a standard shop floor production process flow for all individual plant or department.  
+
<u>'''Note: 2'''</u>&nbsp;Please avoid setting up a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming set up for one specific assembly exclusively.
  
NOTE''':'''
+
&nbsp;
  
Please avoid setup a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming setup for one specific assembly exclusively.
 
  
== Production Setup ==
+
= <span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup"><span class="mw-headline" id="Traceability_Setup">Traceability Setup</span></span></span></span></span></span></span></span></span></span> =
  
1. To access the Production Setup page, navigate to '''Shop Floor Control <nowiki>></nowiki> Production Control'''.
+
To access the traceability&nbsp;Setup page, navigate to '''Shop Floor Control >&nbsp;Production Control > Traceability Setup.'''
  
'''Figure 1: Production Set-Up (PTS)'''  
+
'''Figure 1: Traceability Setup&nbsp;'''
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 01.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 01.png]]  
+
'''[[File:TSU TraceabilitySetup.png|1200px|TSU TraceabilitySetup.png]]'''
  
<br>
+
&nbsp;
  
<br>
+
&nbsp;
  
=== Create a New Production Line  ===
+
&nbsp;
  
'''Figure 2: Create New Line'''
+
== <span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line"><span class="mw-headline" id="Create_a_New_Production_Line">Create a New Production Line</span></span></span></span></span></span></span></span></span></span></span> ==
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 02.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 02.png]]
+
'''Figure 2: Create New Line'''
  
<br>
+
[[File:TSU CreateNewLine.png|1200px|TSU CreateNewLine.png]]
  
1. Select '''Create Production Line'''.
+
&nbsp;
  
2. Enter the new Production Line Name. (See following section for naming format suggestions).  
+
1. Select '''Create Production Line'''.
  
3. Select '''Create''' to confirm addition.  
+
2. Enter the new Production Line Name. (See the following section for naming format suggestions).
  
NOTE: Suggested naming format for Production Line.  
+
3. Select '''Create''' to confirm the addition.
  
'''By Shop Floor Location'''
+
Note the following naming conventions for the Production Line.
  
Format: Area Location <nowiki>+</nowiki> Production Zone - Production Part Number - Production Process - Production Side
+
&nbsp;
  
Area Location: F (Floor), G (Ground)
+
=== <span class="mw-headline" id="By_Shop_Floor_Location"><span class="mw-headline" id="By_Shop_Floor_Location"><span class="mw-headline" id="By_Shop_Floor_Location">By Shop Floor Location</span></span></span> ===
  
Production Zone: Floor level or zone area in production either in alpha or number format.  
+
Format: Area Location&nbsp;
 +
<nowiki>+</nowiki>
 +
&nbsp;Production Zone - Production Part Number - Production Process - Production Side Area Location: F (Floor), G (Ground) Production Zone: Floor level or zone area in production either in alpha or number format. Production Part Number: as named. Production Process: S (SMT), H (Hand Load) Production Side: T (Top), B (Bottom) Example: F2-ABC12345-S-T
 +
Production Line for product ABC12345 top side SMT production at 2<sup>nd</sup>floor'''.'''
  
Production Part Number: as named.
+
&nbsp;
  
Production Process: S (SMT), H (Hand Load)
+
=== <span class="mw-headline" id="By_Production_Process"><span class="mw-headline" id="By_Production_Process"><span class="mw-headline" id="By_Production_Process">By Production Process</span></span></span> ===
  
Production Side: T (Top), B (Bottom)  
+
Format: Production Process&nbsp;
 +
<nowiki>+&nbsp;</nowiki>
 +
Production Zone – Production Part Number – Production Side Production Process: S (SMT), H (Hand Load) Production Zone: Floor level or zone area in production either in alpha or number format.
 +
Production Part Number: as named.
  
Example: F2-ABC12345-S-T  
+
Production Side: T (Top), B (Bottom)
  
Production Line for produc ABC12345 top side SMT production at 2<sup>nd</sup>floor'''.'''
+
Example: S2-ABC12345-T
  
'''By Production Process'''
+
Production Line for product ABC12345 top side at SMT Line/Zone 2.
  
Format: Production Process <nowiki>+</nowiki> Production Zone – Production Part Number – Production Side
+
&nbsp;
  
Production Process: S (SMT), H (Hand Load)
+
&nbsp;
  
Production Zone: Floor level or zone area in production either in alpha or number format.
+
== <span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line"><span class="mw-headline" id="Search_a_Production_Line">Search a Production Line</span></span></span></span></span></span></span></span></span></span></span></span> ==
  
Production Part Number: as named.
+
'''Figure 3: Search Production Line'''
  
Production Side: T (Top), B (Bottom)
+
[[File:TSU SearchProductionLine.png|1200px|TSU SearchProductionLine.png]]
  
Example: S2-ABC12345-T
+
&nbsp;
  
Production Line for produc ABC12345 top side at SMT Line/Zone 2.
+
1. Enter the production line name or keywords in the Search Line Name field.
  
 +
2. Select the line name from the list.
  
 +
3. The related production line will be listed in Production Line Available text box.
  
=== Search a Production Line  ===
+
'''<u>Note:</u>''' Input the first 1 or 4 keywords for the line name, then the line name will display.
  
'''Figure 3: Search Production Line<br>'''
+
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 03.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 03.png]]
+
&nbsp;
  
<br>  
+
== <span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line"><span class="mw-headline" id="Rename_Production_Line">Rename Production Line</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
1. Enter the production line name or key words in the Search Line Name field.
+
'''Figure 4: Rename Production Line'''
  
2. Select the line name from the list.  
+
[[File:TSU RenameProductionLine.png|1200px|TSU RenameProductionLine.png]]
  
3. The related production line will be listed in Production Line Available text box.
+
&nbsp;
  
NOTE: Input the first 1 or 4 key words for the line name, then the line name will display.
+
1. Select the production line from the Production Line list.
  
 +
2. Open the pop-up menu by Right-Clicking, and then select '''Rename Production Line'''.
  
 +
3. Enter the New Name in "New Production Line".
  
=== Rename Production Line  ===
+
4. Select '''Change''' to rename the production line.
  
'''Figure 4: Rename Production Line'''
+
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 04.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 04.png]]
+
'''Figure 5: Rename Production Line Form'''
  
<br>
+
[[File:TSU RenameProductionLineForm.png|1200px|TSU RenameProductionLineForm.png]]
  
1. Select the production line from the Production Line list.
+
&nbsp;
  
2. Open the pop-up menu by Right-Clicking, and then select '''Rename Production Line'''.  
+
'''<u>Note:</u>'''&nbsp;The production line name can be changed only when the production line is in offline mode.
  
3. Enter the New Name in "New Production Line".
+
&nbsp;
  
4. Select '''Change''' to rename the production line.
+
== <span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation"><span class="mw-headline" id="Create_a_New_Workstation">Create a New Workstation</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
 +
1. Select '''Create Workstation''' from the functional options menu. (See the following section for naming format suggestions).
  
 +
2. '''Workstation Name''': Enter the workstation name.
  
'''Figure 5: Rename Production Line Form'''  
+
3. Select the '''Equipment. '''(This is optional)
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 05.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 05.png]]
+
4. Select '''Create''' to create the new workstation.
  
<br>
+
&nbsp;
  
NOTE''':''' Production line name can be changed only when the production line is in off-line mode.
+
'''Figure 6: Workstation Name and Equipment'''
  
 +
[[File:TSU WorkstationNameandEquipment.png|1200px|TSU WorkstationNameandEquipment.png]]
  
 +
&nbsp;
  
=== Hide/Recover Production Line  ===
+
<u>'''Note:'''</u>&nbsp;The equipment should be added first in '''Production >&nbsp;SMT Machine part Traceability > Machine Registry '''module. The suggested naming format for Workstation.
  
'''Figure 6: Hide/Recover Production Line'''
+
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 06.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 06.png]]
+
=== <span class="mw-headline" id="By_Shop_Floor_Location_2"><span class="mw-headline" id="By_Shop_Floor_Location_2"><span class="mw-headline" id="By_Shop_Floor_Location_2">By Shop Floor Location</span></span></span> ===
  
<br>  
+
Format: Area Location&nbsp;
 +
<nowiki>+</nowiki>
 +
&nbsp;Production Zone - Placement Machine Example: F2-CP6B
 +
Explanation: Fuji CP6B placement machine is located on 2<sup>nd</sup> Floor.
  
1. Select '''Hide/Recover Production line'''.
+
&nbsp;
  
 +
=== <span class="mw-headline" id="By_Production_Process_2"><span class="mw-headline" id="By_Production_Process_2"><span class="mw-headline" id="By_Production_Process_2">By Production Process</span></span></span> ===
  
 +
Format: Production Process&nbsp;<nowiki>+&nbsp;</nowiki>Line/Zone - Placement Machine Example: S2-CP6A
  
'''Figure 7: Hide a Production Line'''
+
Explanation: Fuji CP6A placement machine is located at SMT Line 2.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 07.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 07.png]]
+
&nbsp;
  
<br>  
+
=== <span class="mw-headline" id="By_Placement_of_machine_model_with_associated_serial_number"><span class="mw-headline" id="By_Placement_of_machine_model_with_associated_serial_number"><span class="mw-headline" id="By_Placement_of_machine_model_with_associated_serial_number">By Placement of machine model with associated serial number</span></span></span> ===
  
2. Selecta production line (The line is in offline and visible status) then select '''Hide Production Line'''.
+
Format: Placement machine model – Placement machine serial number
  
3. Select '''OK '''to hide the production line or '''Cancel '''to exit.
+
Example: CP6-SN12345
  
 +
Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.
  
 +
&nbsp;
  
'''Figure 8: Recover a Production Line'''
+
== <span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation"><span class="mw-headline" id="Hide_WorkStation">Hide WorkStation</span></span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 08.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 08.png]]
+
'''Figure 7: Hide Workstation'''
  
<br>
+
[[File:PSU HideWorkstation.png|1200px|PSU HideWorkstation.png]]
  
4. Selecta production line (The line is in offline and hidden status) then select '''Recover Production Line.'''  
+
1. Select '''Hide WorkStation'''.
  
5. Select '''OK''' to recover the production line or '''Cancel''' to exit.
+
2. Select a WorkStation (The Workstation should be at visible status)
  
NOTE: The online production line not allowed to be hidden. Please set the production line to "off-line" before hiding it.  
+
3. Select '''Send''' to hide the WorkStation or '''Cancel '''to exit.
  
 +
&nbsp;
  
 +
&nbsp;
  
=== Workstation  ===
+
== <span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation"><span class="mw-headline" id="Recover_WorkStation">Recover WorkStation</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
==== Create a New Workstation  ====
+
'''Figure 8: Recover Work Station'''
  
1. Select '''Create Workstation''' from the functional option menu. (See following section for naming format suggestions).  
+
[[File:TSU RecoverWorkStation.png|1200px|TSU RecoverWorkStation.png]]
  
2. '''Workstation Name''': Enter the workstation name.  
+
1. Select '''Recover WorkStation'''.
  
3. Select the '''Equipment. '''(This is optional)  
+
2. Select a WorkStation (The Workstation is at hidden status).
  
4. Select '''Create''' to create the new workstation.  
+
3. Select '''Send''' to recover the WorkStation or '''Cancel''' to exit.
  
<br>
+
&nbsp;
  
'''Figure 9: Workstation Name and Equipment'''
+
== <span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line"><span class="mw-headline" id="Hide.2FRecover_Production_Line">Hide/Recover Production Line</span></span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 09.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 09.png]]
+
If you need to hide&nbsp;the obsolete PTS Production Lines, then you can do that by yourself by following the steps. Otherwise, the MES Support team will be able to help you out if you need to do something at the database level.&nbsp;
  
<u></u><br>
+
'''Figure 9: Hide/Recover Production Line'''
  
NOTE: The equipment should be added first in '''Production <nowiki>></nowiki> SMT Machine part Traceability <nowiki>></nowiki> Machine Registry''' module.<br>Suggested naming format for Workstation
+
[[File:TSU Hide RecoverProductionLine.png|1200px|TSU Hide RecoverProductionLine.png]]
  
'''By Shop Floor Location'''
+
&nbsp;
  
Format: Area Location <nowiki>+</nowiki> Production Zone - Placement Machine
+
1. Select '''Hide/Recover Production line'''.
  
Example: F2-CP6B
+
&nbsp;
  
Explanation: Fuji CP6B placement machine located at 2<sup>nd</sup> Floor.
+
'''Figure 10: Hide a Production Line'''
  
'''By Production Process'''
+
[[File:TSU HideaProductionLine.png|1200px|TSU HideaProductionLine.png]]
  
Format: Production Process <nowiki>+</nowiki> Line/Zone - Placement Machine
+
&nbsp;
  
Example: S2-CP6A
+
2. Select a production line (The line is in offline and visible status) then select '''Hide Production Line'''.
  
Explanation: Fuji CP6A placement machine located at SMT Line 2.  
+
3. Select '''OK '''to hide the production line or '''Cancel '''to exit.
  
'''By Placement machine model with associated serial number'''  
+
4. Select a production line (The line is in offline and hidden status) then select '''Recover Production Line.'''
  
Format: Placement machine model – Placement machine serial number
+
5. Select '''OK''' to recover the production line or '''Cancel''' to exit.
  
Example: CP6-SN12345
+
<u>'''Note:'''</u> The online production line is not allowed to be hidden. Please set the production line to "off-line" before hiding it.
  
Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.
+
&nbsp;
  
==== Hide WorkStation  ====
+
== <span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation"><span class="mw-headline" id="Add_WorkStation">Add WorkStation</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
'''Figure 10: Hide Workstation'''
+
This module allows the user to add or remove workstation(s) from the production line.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 10.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 10.png]]
+
&nbsp;
  
<br>
+
&nbsp;
  
1. Select '''Hide WorkStation'''.
+
=== <span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line"><span class="mw-headline" id="Adding_Workstation_into_a_Production_Line">Adding Workstation into a Production Line</span></span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
2. Select a WorkStation (The Workstation should be at visible status)
+
'''Figure 11: Add Workstation into a Production Line'''
  
3. Select '''Send''' to hide the WorkStation or '''Cancel '''to exit.  
+
[[File:TSU AddWorkstationintoProductionLine.png|1200px|TSU AddWorkstationintoProductionLine.png]]
  
==== Recover WorkStation  ====
+
&nbsp;
  
'''Figure 11: Recover Work Station'''
+
1. Select the production line from the production Line list.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 11.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 11.png]]
+
2. Open the pop-up menu by right-clicking on the line name then select '''Add Workstation''' menu. Select the workstation name from the Workstation name pull-down list to add to the specific production line.
  
<br>
+
3. Select '''Add''' to add the workstation.
  
1. Select '''Recover WorkStation'''.
+
&nbsp;
  
2. Select a WorkStation (The Workstation is at hidden status).
+
'''Figure 12: Add Workstation- Set Button'''
  
3. Select '''Send''' to recover the WorkStation or '''Cancel''' to exit.
+
[[File:TSU AddWorkstation-Set Button.png|1200px|TSU AddWorkstation-Set Button.png]]
  
 +
&nbsp;
  
 +
<u>'''Note 1:'''</u> The selected production line must be offline for workstation addition or removal.
  
=== Add WorkStation  ===
+
<u>'''Note 2:'''</u> The Workstation Name will be auto-completed after entering the first 4 characters.
  
This module allows the user to add or remove workstation(s) from production line.
+
&nbsp;
  
==== Adding Workstation into a Production Line ====
+
=== <span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line"><span class="mw-headline" id="Removing_Workstation_from_a_Production_Line">Removing Workstation from a Production Line</span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
'''Figure 12: Add Workstation into a Production Line'''
+
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 12.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 12.png]]
+
'''Figure 13: Remove Workstation'''
  
<br>
+
[[File:TSU RemoveWorkstation.png|1200px|TSU RemoveWorkstation.png]]
  
1. Select the production line from the production Line list.
+
&nbsp;
  
2. Open the pop-up menu by right-clicking on the line name then select '''Add Workstation''' menu. Select the workstation name from Workstation name pull down list to add to the specific production line.  
+
1. Select the production line from the production Line list menu.
  
3. Select '''Add''' to add the workstation.  
+
2. Select the workstation name from the Workstation pull-down list which is under "In Use."
  
<br>
+
3. Open the pop-up menu by right-clicking on the workstation then select the&nbsp;'''Remove Workstation''' menu.
  
'''Figure 13: Add Workstation- Set Button'''  
+
4. Select '''OK''' to remove the Workstation from this production line or select '''Cancel''' to exit.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 13.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 13.png]]
+
&nbsp;
  
<br>  
+
=== <span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="Workstation_Maintenance"><span class="mw-headline" id="WorkStation_Maintenance"><span class="mw-headline" id="WorkStation_Maintenance"><span class="mw-headline" id="WorkStation_Maintenance">Workstation Maintenance</span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
NOTE: The selected production line must be off-line for workstation addition or removal.
+
&nbsp;
  
NOTE: The Workstation Name will auto-completed after input the first 4 keywords.
+
'''Figure 14: Workstation Maintenance'''
  
 +
[[File:TSU WorkstationMaintenance.png|1200px|TSU WorkstationMaintenance.png]]
  
 +
&nbsp;
  
==== Removing Workstation from a Production Line  ====
+
1. Select the production line from the production line list.
  
'''Figure 14: Remove Workstation'''
+
2. Select the workstation from the workstation(s) list.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 14.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 14.png]]
+
3. Open the pop-up menu by right-clicking then select the&nbsp;'''Workstation Maintenance''' option<font color="#00000A">.</font>
  
<br>  
+
<font color="#00000A">4. </font>Renaming: Fill in a new workstation name in the '''New Workstation''' field and then select '''Change '''to rename the selected workstation name.
  
<br>
+
5. Equipment: Select the Equipment, then select '''Change '''to reset the Workstation type.
  
1. Select the production line from the production Line list menu.
+
&nbsp;
  
2. Select the workstation name from Workstation pull down list which is under "In Use."
+
'''Figure 15: Workstation Maintenance- Detail'''
  
3. Open the pop-up menu by right-clicking on the workstation then select '''Remove Workstation''' menu.  
+
[[File:TSU WorkstationMaintenance-Detail.png|1200px|TSU WorkstationMaintenance-Detail.png]]
  
4. Select '''OK''' to remove the Workstation from this production line or select '''Cancel''' to exit.
+
<br/> '''<u>Note:</u>''' The workstation can be renamed only when the production line is in "offline" mode.
 
 
 
 
 
 
==== WorkStation Maintenance  ====
 
 
 
<br>  
 
 
 
'''Figure 15: Workstation Maintenance'''<br>  
 
 
 
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 15.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 15.png]]
 
 
 
<br>
 
 
 
<br>
 
 
 
1. Select the production line from the production line list.
 
 
 
2. Select the workstation from the workstation(s) list.
 
 
 
3. Open the pop-up menu by right-clicking then select '''Workstation Maintenance''' option<font color="#00000A">.</font>  
 
 
 
<font color="#00000A">4. </font>Renaming: Fill in a new workstation name in the '''New Workstation''' field and then select '''Change '''to rename the selected workstation name.
 
 
 
5. Equipment: Select the Equipment, then select '''Change '''to reset the Workstation type.<br>
 
 
 
<br>
 
 
 
'''Figure 16: Workstation Maintenance- Detail'''
 
 
 
[[Image:16 PDS Detail workstation maintenance.png|700px|16 PDS Detail workstation maintenance.png]]<br>
 
 
 
<br>
 
 
 
<br> NOTE: The workstation can be renamed only when the production line is in "off-line" mode.  
 
  
 
(See Set Production Off-Line)
 
(See Set Production Off-Line)
  
 +
&nbsp;
  
 +
== <span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence"><span class="mw-headline" id="Workstation_Sequence">Workstation Sequence</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
=== Workstation Sequence  ===
+
The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.
 
 
The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.  
 
 
 
Following is the example to redefine the workstation sequence:
 
  
 +
&nbsp;
  
 +
'''Figure 16: Workstation Sequence'''
  
'''Figure 17: Workstation Sequence in a Production Line- Before'''
+
[[File:TSU WorkstationSequence.png|1200px|TSU WorkstationSequence.png]]
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 17.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 17.png]]
+
1. Select the production line from the production Line list.
  
<br>
+
2. Select the workstation from the workstation(s) list.
  
1. Select the production line from the production Line list.  
+
3. Select '''Workstation''' '''Sequence''' to shift up the Workstation process sequence.
  
2. Select the workstation from the workstation(s) list.  
+
<u>'''Note:'''</u>The workstation process sequence goes from down to up and is allowed under the Workstation Sequence option. Please move each workstation to the correct workstation process sequence if required.&nbsp;
  
3. Select '''Workstation''' '''Sequence''' to shift up the Workstation process sequence.
+
&nbsp;
  
<br>
 
  
'''Figure 18: Workstation Sequence in a Production Line- After'''
+
== <span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup"><span class="mw-headline" id="Workstation_Setup">Workstation Setup</span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 18.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 18.png]]
+
This module allows the user to set up the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.
  
<u></u>
+
&nbsp;
  
<br>
+
'''Figure 17: Workstation Sequence in a Production Line- After'''
  
<br>
+
[[File:TSU WorkstationSet-UpParameters.png|1100px|TSU WorkstationSet-UpParameters.png]]
  
NOTE: The workstation process sequence goes from down to up and is allowed under the '''Workstation Sequence''' option. Please move each workstation to the correct workstation process sequence if required.  
+
<br/> 1. Select the production line from the production Line list.
  
 +
2. Select the workstation to be set up, then right-click to open the pop-up menu.
  
 +
3. Select '''Workstation Setup'''.
  
=== Workstation Setup  ===
+
&nbsp;
  
This module allows the user to setup the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.
+
=== <span class="mw-headline" id="Workstation_Setup_Parameters"><span class="mw-headline" id="Workstation_Setup_Parameters"><span class="mw-headline" id="Workstation_Setup_Parameters">Workstation Setup Parameters</span></span></span> ===
  
<br>
+
'''1. Barcode Regulation: (Recommended)'''
  
'''Figure 19: Workstation Set-Up Parameters'''
+
Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 19.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 19.png]]
+
For example: The plant set the Barcode Regulation: '''^JZ[0-9]{6}$'''. Then the barcode can be '''JZ057867,JZ057868.''' {6} means the number of characters.[0-9] means the characters can be numbers from 0 to 9.
  
<br>
+
The regulation applies to the Regular expression, please click [https://en.wikipedia.org/wiki/Regular_expression here] to see more about the Regular Expression.
  
<br> 1. Select the production line from the production Line list.  
+
2. '''Scanning Behavior: (Compulsory)'''
  
2. Select the workstation to be set up, then right-click to open the pop-up menu.  
+
*'''Scan by Later Workstation: '''All workstation material placements can be recorded with the next Workstation(s).  
 +
*'''Must Scan At this Workstation: '''All workstation material placements are required to be recorded at this Workstation before reaching and/or scanning at the next Workstation(s).
 +
*'''Scan for Previous Workstation: '''All these workstation material placements will be recorded with the previous Workstation placements.  
  
3. Select '''Workstation Setup'''.
+
3. '''Scan Board/Panel:''' '''(Compulsory)'''
  
'''Workstation Setup Parameters'''
+
Select the Scan Board/Panel for both 1<sup>st</sup> Side and 2<sup>nd</sup> Side
 
 
1. '''Barcode Regulation: (Recommended)'''
 
 
 
Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.
 
 
 
2. '''Scanning Behavior: (Compulsory)'''
 
 
 
*'''Scan by Later Workstation: ''' All this workstation material placements can be recorded with the next Workstation(s).
 
*'''Must Scan At this Workstation: '''All this workstation material placements are required to be recorded at this Workstation before reach and/or scan at next Workstation(s).
 
*'''Scan for Previous Workstation: '''All this workstation material placements will be recorded with the previous Workstation placements.
 
 
 
3. '''Scan Board/Panel:''' '''(Compulsory)'''
 
 
 
Select the Scan Board/Panel for both 1<sup>st</sup> Side and 2<sup>nd</sup> Side  
 
  
 
*'''Board''': Each individual PCB board number.  
 
*'''Board''': Each individual PCB board number.  
 
*'''Panel''': Each PCB panel number.  
 
*'''Panel''': Each PCB panel number.  
*'''Serial''': Each PCB serial number.
+
*'''Serial''': Each PCB serial number.  
 
 
4. '''Scan Extra S/N: (Compulsory)'''
 
  
Define if required extra serial need to be scanned. If it is required to scan the PCB boards additional barcodes such as, the package label, select '''Yes'''. Default is '''No'''.
+
4. '''Scan Extra S/N: (Compulsory)'''
  
5. '''S/N Regulation:''' '''(Required if Scan Extra S/N is Yes)'''  
+
Define if extra serial needs to be scanned. If it is required to scan the PCB board's additional barcodes such as the package label, select '''Yes'''. Default is '''No'''.
  
Define the serial number barcode regulation.  
+
5. '''S/N Regulation:''' '''(Required if Scan Extra S/N is Yes)'''
  
6. '''Completed MSD:''' '''(Required if MSD control is needed)'''
+
Define the serial number barcode regulation.
  
Default is '''No'''.
+
6. '''Completed MSD:''' '''(Required if MSD control is needed)'''
  
Note: MSD control is only applied to the&nbsp;workstation(s)&nbsp;prior reflowing process.  
+
Default is '''No'''.
  
7. '''Scan Side''': '''(Required if Scan board/Panel is "Yes")'''
+
Note: MSD control is only applied to the&nbsp;workstation(s)&nbsp;prior reflowing process.
  
Define which production side(s) needed to be scanned.
+
7. '''Scan Side''': (Required if Scan board/Panel is "Yes")
  
*'''1st ''''''Side: '''First PCB production side or One PCB production side.
+
Define which production side(s) need to be scanned.
  
I.e. Such as PCB<nowiki>’</nowiki>s TOP side production only which do only have material placements on one PCB side.  
+
*'''1st Side''': First PCB production side or One PCB production side.  
  
*'''2nd ''''''Side: '''Second PCB production side.
+
I.e. Such as PCBs TOP side production only which does only have material placements on one PCB side.
  
I.e. Such as TOP side can be called 2<sup>nd</sup> Side as it is the second production side after BOTTOM side placement finished.  
+
*'''2nd Side''': Second PCB production side.  
  
*'''1'''<sup></sup>'''st''&amp; 2''''''nd ''''''Side: '''Top and Bottom side.'''
+
I.e. Such as the TOP side can be called the 2<sup>nd</sup> Side as it is the second production side after the BOTTOM side placement is finished.
  
I.e. Both production sides required to be scanned at the same Workstation.  
+
*'''1<sup>st</sup>& 2<sup>nd</sup> Side: '''Top and Bottom side.  
  
8. '''Scan Material: (Compulsory)'''
+
I.e. Both production sides are required to be scanned at the same Workstation.
  
<br>
+
8. '''Scan Material: (Compulsory)'''
  
*Select '''Material Barcode''' (For plant which used PTS format material label that included a unique printed PTS material barcode).  
+
*Select '''Material Barcode''' (For plants that used PTS format material label that included a unique printed PTS material barcode).  
*Select '''SSCI P/N''' (For plant which might used standard plant approved / developed material label that included printed SSCI Part Number barcode).  
+
*Select '''SSCI P/N''' (For plants which might be used standard plant-approved/developed material label that included printed SSCI Part Number barcode).  
*Select '''Manufacturer P/N''' (For plant which might&nbsp;used manufacturer provided label that included printed manufacturer Part Number barcode)
+
*Select '''Manufacturer P/N''' (For a plant that might&nbsp;use the manufacturer-provided label that included printed manufacturer Part Number barcode)  
  
9. '''Process: (Compulsory)'''  
+
9. '''Process: (Compulsory)'''
  
Select the type of process this workstation should be
+
Select the type of process for this workstation:
  
1. '''SMT''': For SMT Machine workstation  
+
a. '''SMT''': For SMT Machine workstation.
  
2. '''Hand Load''': For Manual process workstation  
+
b. '''Hand Load''': For Manual process workstation.
  
3. '''AI''': For Auto Insertion workstation  
+
c. '''AI''': For Auto Insertion workstation.
  
'''Note''': Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.  
+
'''<u>Note:</u>''' Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.
  
10. '''Device ID''': (Optional)  
+
10. '''Device ID''': (Optional)
  
Enter any integer from 0 to 999 according to the SFDC setup.  
+
Enter any integer from 0 to 999 according to the SFDC setup. If the generic attribute is set for higher device numbers using the base 34 system, the device ID may go from 0 to ZZZ.
  
11. Select '''Change''' to set up this workstation.  
+
11. Select '''Change''' to set up this workstation.
  
12. Select '''History''' to check the log for the change of setup parameters.  
+
12. Select '''History''' to check the log for the change of setup parameters.
  
 +
&nbsp;
  
 +
== <span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List"><span class="mw-headline" id="Define_Pick_List">Define Pick List</span></span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
=== Define Pick List  ===
+
This module allows the user to assign the early prepared/loaded SMT placement program to a Workstation under the specific Production Line.
  
This module allows the user to assign the early prepared/loaded SMT placement program into a Workstation under the specific Production Line.
+
'''Figure 18: Select Picklist for Workstation'''
  
'''Figure 20: Select Picklist for Workstation'''
+
[[File:TSU SelectPicklistWorkstation.png|1100px|TSU SelectPicklistWorkstation.png]]
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 20.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 20.png]]
+
1. Select the production line from the production Line list.
  
<br>
+
2. Select the workstation, then right-click to open the pop-up menu.
  
1. Select the production line from the production Line list.  
+
3. Select '''Define Picklist'''.
  
2. Select the workstation, then right-click to open the pop-up menu.  
+
4. Enter the keywords for the Picklist name.
  
3. Select '''Define Picklist'''.  
+
5. Select '''Search''' to search Picklist name.
  
4. Enter the keywords for Picklist name.  
+
6. Select the Picklist name to view material placements with reference designator listing.
  
5. Select '''Search''' to search Picklist name.
+
&nbsp;
  
6. Select the Picklist name to view material placements with reference designator listing.
+
'''Figure 19: Show Picklist Option'''
  
 +
[[File:TSU ShowPicklistOption.png|1100px|TSU ShowPicklistOption.png]]
  
 +
&nbsp;
  
'''Figure 21: Show Picklist Option'''  
+
7. Select
 +
<nowiki>+</nowiki>
 +
&nbsp;to assign the selected picklist to the Workstation. <u>'''Note:'''</u> For additional Picklist information, see the SMT Part Traceability work instruction.
 +
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 21.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 21.png]]
+
=== <span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping"><span class="mw-headline" id="Location_mapping">Location mapping</span></span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
<br>
+
This sub-module is designed to map the Traceability workstation with the SFDC location so that SFDC will forward serial number information to the pre-mapped Traceability workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.
  
7. Select "'''<nowiki>+</nowiki>'''" to assign the selected picklist into the Workstation.
+
To map a Traceability workstation with an SFDC location, please select the workstation of a production line, right-click to open the pop-up menu then click on '''Location Mapping.'''
  
NOTE''':''' For additional detailed Picklist information, refer to EZ Pick List Work Instruction.
+
<br/> '''Figure 20: Location Mapping Interface'''
  
 +
[[File:TSU LocationMappingInterface.png|1100px|TSU LocationMappingInterface.png]]
  
 +
<br/> 1. To update an existing mapping, double click on existing mapping; edit the information, then select '''Update'''.
  
=== Location mapping ===
+
2. To delete the existing mapping, select '''Delete'''.
  
This sub-module is designed to map PTS workstation with SFDC location, so that SFDC will forward serial number information to pre-mapped PTS workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.  
+
3. To configure a new mapping, select '''Add,''' and a new line will be created.
  
To map a PTS workstation with a SFDC location, please select the workstation of a production line, and right-click to open the pop-up menu then click on '''Location Mapping.'''
+
*MES User ID (Mandatory): SFDC user ID at MES. Select from the drop-down list.  
 
+
*Location Name (Mandatory): Fill in the SFDC location name that to be mapped with the selected PTS workstation.  
 
 
'''Figure 22: Location Mapping Interface'''
 
 
 
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 22.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 22.png]]
 
 
 
<br> 1. To update an existing mapping, double click on existing mapping; edit the information, then select '''Update'''.
 
 
 
2. To delete a existing mapping, select '''Delete'''.
 
 
 
3. To configure a new mapping, select '''Add''' and a new line will be created.
 
 
 
*MDS User ID (Mandatory): SFDC user ID at MDS. Select from the drop-down list.  
 
*Location Name (Mandatory): Fill in SFDC location name that to be mapped with selected PTS workstation.  
 
 
*Device ID (Optional): Fill in SFDC Device ID.  
 
*Device ID (Optional): Fill in SFDC Device ID.  
*Select '''Update''' to complete the mapping or '''Cancel''' to exit.
+
*Select '''Update''' to complete the mapping or '''Cancel''' to exit.  
 
 
<br>
 
 
 
=== Set Production On/Off-Line  ===
 
 
 
==== Set Production On-Line  ====
 
 
 
*Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.
 
  
 +
&nbsp;
  
 +
== <span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line"><span class="mw-headline" id="Set_Production_On.2FOff-Line">Set Production On/Off-Line</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
'''Figure 23: Work Order Selection When Set Production On-Line'''
+
=== <span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line"><span class="mw-headline" id="Set_Production_On-Line">Set Production On-Line</span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 23.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 23.png]]
+
Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.
  
<br>
+
&nbsp;
  
1. Select the production line to be set on line from the production Line list.
+
'''Figure 21: Work Order Selection When Set Production On-Line'''
  
2. Open the pop-up menu by right-clicking, and then select '''Set Production online'''.  
+
[[File:TSU WOSelectionOn-Line.png|1200px|TSU WOSelectionOn-Line.png]]
  
3. Enter a released Work Order number, if known, or Select the work order from the list by selecting '''Show'''.
+
&nbsp;
  
4. Select the Work Order (you can view the BOM detail by selecting the "<nowiki>+</nowiki>" at the left).  
+
1. Select the production line to be set online from the production Line list.
  
5. Select the "<nowiki>+</nowiki>" at the right to select the Work order.  
+
2. Open the pop-up menu by right-clicking, and then selecting '''Set Production On Line'''.
  
6. Select '''Check''' in the'''BOM/PL''' column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.  
+
3. Enter a released Work Order number, if known, or Select the work order from the list by selecting '''Show'''.
  
 +
4. Select the Work Order (you can view the BOM detail by selecting the
 +
<nowiki>+</nowiki>
 +
at the left).
 +
5. Select the &nbsp;
 +
<nowiki>+</nowiki>
 +
&nbsp;at the right to select the Work order.
 +
6. Select '''Check''' in the '''BOM/PL''' column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.
  
 +
&nbsp;
  
'''Figure 24: Select Work Order'''  
+
*'''Items that do not exist in BOM'''  
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 24.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 24.png]]
+
To compare and validate all material placements in the SMT placement program (i.e. PickList) that do not exist in ERP BOM.
  
<br>
+
*'''Items that do not exist in PickList'''
  
'''Figure 25: Show BOM/PL Validation'''
+
To compare and validate all material placements in ERP BOM that do not exist in the SMT placement program (i.e. PickList).
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 25.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 25.png]]
+
7. Fill in the required Work Order with the associated production ECN.
  
<br>
+
8. Select '''Online''' to set the production line online after confirming the Work Order and ECN selection.
  
*'''Items that do not exist in BOM'''
+
<u>'''Note:'''</u>&nbsp;If the work order BOM components do not match the defined picklist, the user will need to follow confirmation and update accordingly.
 
 
To compare and validate all material placements in SMT placement program (i.e. PickList) that does not exist in Oracle BOM.
 
 
 
*'''Items that do not exist in PickList'''
 
 
 
To compare and validate all material placements in Oracle BOM that does not exist in SMT placement program (i.e. PickList).
 
 
 
7. Fill the required Work Order with associated production ECN.
 
 
 
8. Select '''On-line '''to set the production line online after confirming the Work Order and ECN selection.
 
 
 
NOTE:
 
 
 
If the work order BOM components do not match the defined picklist , the user will need to follow confirmation and update accordingly as shown below:
 
  
 
*Confirm that the Work Order you enter/select is associated with the latest ECN.  
 
*Confirm that the Work Order you enter/select is associated with the latest ECN.  
*Confirm the Picklist defined is correct.
+
*Confirm the Picklist defined is correct.  
 
 
<br>
 
 
 
==== Set Production Off-Line  ====
 
 
 
Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.
 
 
 
1. Select the production line to be set on line from the production Line list.
 
 
 
2. Open the pop-up menu by right-clicking then select '''Set Production offline'''.
 
 
 
3. Choose '''Set Production On/Off Line''' functional module.
 
 
 
4. Select '''Off Line''' to set the line offline.
 
 
 
 
 
 
 
'''Figure 26: Setup Production Offline'''
 
 
 
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 26.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 26.png]]
 
  
<br>
+
&nbsp;
  
=== Load All  ===
+
=== <span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line"><span class="mw-headline" id="Set_Production_Off-Line">Set Production Off-Line</span></span></span></span></span></span></span></span></span></span></span></span></span> ===
  
<font color="#00000A">This module allows the user to load all materials to the workstation under the following conditions.</font>
+
Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.
  
<font color="#00000A">1. Set the production line offline (Don<nowiki>’</nowiki>t unload materials).</font>
+
1. Select the production line to be set online from the production Line list.
  
<font color="#00000A">2. Change setting for the workstation if needed.</font>
+
2. Open the pop-up menu by right-clicking then select '''Set Production offline'''.
  
<font color="#00000A">3. Set the production line on line again.</font>
+
3. Choose '''Set Production On/Off-Line''' functional module.
  
<font color="#00000A">4. The user can use the "Load All" function to load all materials to the workstation.</font>
+
4. Select '''Off-Line''' to set the line offline.
  
<font color="#00000A">NOTE: The user can only load all when not using the unload function.</font>
+
&nbsp;
  
<font color="#00000A">NOTE: If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.</font>
+
'''Figure 22: Setup Production Offline'''
  
<font color="#00000A"></font>
+
[[File:TSU SetupProductionOffline.png|1200px|TSU SetupProductionOffline.png]]
  
'''Figure 27: Load All'''
+
&nbsp;
  
[[Image:SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 27.png|700px|SOP-5-I-PTSxxxx-C RA1 PTS Production Setup 27.png]]
+
== <span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All"><span class="mw-headline" id="Load_All">Load All</span></span></span></span></span></span></span></span></span></span></span></span></span> ==
  
<br>
+
This module allows the user to load all materials to the workstation under the following conditions.
  
1. Select the production line to be set on line from the production Line list.  
+
1. Set the production line offline (do not unload materials).
  
2. Open the workstation lists by selecting the "<nowiki>+</nowiki>" at the left.  
+
2. Change the setting for the workstation if needed.
  
3. Open the pop-up menu by right-clicking on the workstation, and then select '''Load All'''.  
+
3. Set the production line to online again.
  
4. The information will display if the load all function succeeds.  
+
4. The user can use the "Load All" function to load all materials to the workstation.
  
5. The user can check the loaded material at the page "Load Material Report."
+
<u>'''Note 1:'''</u> The user can only load all when not using the unload function.
  
== Further Information  ==
+
<u>'''Note 2:'''</u> If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.
  
This completes PTS Production Setup information. For further information on a specific functional area refer to SanminaNet.
+
&nbsp;
  
SOP-5-I-PTS0010_C_R3_Production Load Material
+
1. Set the production line online from the Production Line list.
  
SOP-5-I-PTS0011-C_R3_PST_PRD_Production_Scan_Board
+
2. Open the workstation lists by selecting the &nbsp;
 +
<nowiki>+</nowiki>
 +
&nbsp;at the left.
 +
3. Open the pop-up menu by right-clicking on the workstation, and then selecting '''Load All'''.
  
SOP-5-I-PTS-0012-C_R3_PST_PRD_Production_Rework_Record
+
4. The information will display if the Load All function succeeds.
  
SOP-5-I-PTS0014_Define_EZ_Pick_List
+
5. The user can check the loaded material on the page "Load Material Report."
  
 
----
 
----
  
== Document Revision History  ==
+
&nbsp;
 
 
{| width="100%" cellspacing="0" cellpadding="4" border="2"
 
|-
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Date</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Author</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Title</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Version</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Change Reference</font>
 
|-
 
| 08/01/13
 
| Helena Wang
 
| Technical Writer
 
| 1.0
 
| Initial SO Work Instruction
 
|-
 
| 02/17/14
 
| Ashley Martin
 
| Technical Writer
 
| 1.0
 
| Review and Format
 
|-
 
| 02/28/14
 
| Elaine Fonaro
 
| Technical Writer
 
| 1.0
 
| Format for WIKI
 
|-
 
| &nbsp;  
 
| &nbsp;
 
| &nbsp;
 
| &nbsp;
 
| &nbsp;
 
|}
 
 
 
[[Category:Uncategorized]]
 

Latest revision as of 20:55, 18 July 2023

42Q Home > Shop Floor Control > Production Control > Traceability Setup
 

 

 

 

 
Traceability Setup
Version MES 15.77
Revision E1
 

 

 

 

Introduction 

This system is designed to collect data from the shop floor and store it in the Manufacturing Execution System (MES). The collected information is used by the Reporting and MESWeb modules to generate quality control reports. The system utilizes both manual and automated barcode scanning techniques to monitor and collect data for a product line or plant. Its primary role is to maintain unit histories and direct product movement on the manufacturing floor.

 

Access Control

The system provides access control between its various modules and screens, ensuring that users can only access the functionalities relevant to their roles. In the current version, the SFDC Configuration page acts as a central hub, providing access to all submodules and their respective functionalities, such as viewing, adding, editing, deleting, printing, and generating output files.

 

General Notes

This user manual serves as a general training guide and does not cover the specific process flows of individual plants or departments. It is important to note that certain 42Q sites may have minor or specific process changes, which will be documented at the site level for reference.

 


Assumptions

Before using the Traceability Production Control system, the following assumptions should be considered:  

  • Availability of SMT Material Placement Program: Ensure that the appropriate SMT material placement program (e.g., Fuji SMT job program) or Hand load material placement (e.g., Material items and associated reference designator under Hand load operation) is available.
  • Serial Number Printing: Verify that a serial number is printed on the board before undergoing SMT and/or Hand load operation processes.
  • Unique Names for SMT Machines: Assign a unique name to each SMT machine for identification purposes. These names will be used within the system to track and manage the production process.

System Setup Scenarios

This overview describes the production setup process in PTSWEB based on two different scenarios:

Scenario A: Production Setup for a new (or previously built) product item on a new shop floor production line


Suggested steps are described in 42Q-MES0049-C SMT Part Traceability.

1. Convert and upload SMT Picklist into PTS.  
2. Create a New Production Line. Refer to Create a New Production Line.
3. Create all required workstations (S). Refer to Create a New Workstation.
4. Add the Workstations into the Production Line by sequence. Refer to Add a Workstation into a Production Line.
5. Define Workstation Process Sequence in a Production Line. Refer to Workstation Sequence.
6. Define Workstation Parameters for each added Workstation(s). Refer to Workstation Setup.
7. Define Picklist for each above-added Workstation(s). Refer to Define Picklist.
8. Define Auto-Scan Mapping. (Optional) Refer to Location Mapping.
9. Set Production Online. Refer to Set Production On/Off-Line.

 

  • Scenario B: Production Setup for a previously built production item on was previously built shop floor production line.

Suggested steps are described n 42Q-MES0049-C SMT Part Traceability.

1. Convert and upload SMT Picklist into PTS.  
2. Define Picklist for each Workstation that corresponds to the associated Production Line. Refer to Define Picklist.
3. Set Production Online. Refer to Set Production On/Off-Line.

Note 1: This work instruction is a general training guide and is not intended to provide a shop floor production process flow for all individual plants or departments.

Note: 2 Please avoid setting up a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming set up for one specific assembly exclusively.

 


Traceability Setup

To access the traceability Setup page, navigate to Shop Floor Control > Production Control > Traceability Setup.

Figure 1: Traceability Setup 

TSU TraceabilitySetup.png

 

 

 

Create a New Production Line

Figure 2: Create New Line

TSU CreateNewLine.png

 

1. Select Create Production Line.

2. Enter the new Production Line Name. (See the following section for naming format suggestions).

3. Select Create to confirm the addition.

Note the following naming conventions for the Production Line.

 

By Shop Floor Location

Format: Area Location  +  Production Zone - Production Part Number - Production Process - Production Side Area Location: F (Floor), G (Ground) Production Zone: Floor level or zone area in production either in alpha or number format. Production Part Number: as named. Production Process: S (SMT), H (Hand Load) Production Side: T (Top), B (Bottom) Example: F2-ABC12345-S-T Production Line for product ABC12345 top side SMT production at 2ndfloor.

 

By Production Process

Format: Production Process  +  Production Zone – Production Part Number – Production Side Production Process: S (SMT), H (Hand Load) Production Zone: Floor level or zone area in production either in alpha or number format. Production Part Number: as named.

Production Side: T (Top), B (Bottom)

Example: S2-ABC12345-T

Production Line for product ABC12345 top side at SMT Line/Zone 2.

 

 

Search a Production Line

Figure 3: Search Production Line

TSU SearchProductionLine.png

 

1. Enter the production line name or keywords in the Search Line Name field.

2. Select the line name from the list.

3. The related production line will be listed in Production Line Available text box.

Note: Input the first 1 or 4 keywords for the line name, then the line name will display.

 

 

Rename Production Line

Figure 4: Rename Production Line

TSU RenameProductionLine.png

 

1. Select the production line from the Production Line list.

2. Open the pop-up menu by Right-Clicking, and then select Rename Production Line.

3. Enter the New Name in "New Production Line".

4. Select Change to rename the production line.

 

Figure 5: Rename Production Line Form

TSU RenameProductionLineForm.png

 

Note: The production line name can be changed only when the production line is in offline mode.

 

Create a New Workstation

1. Select Create Workstation from the functional options menu. (See the following section for naming format suggestions).

2. Workstation Name: Enter the workstation name.

3. Select the Equipment. (This is optional)

4. Select Create to create the new workstation.

 

Figure 6: Workstation Name and Equipment

TSU WorkstationNameandEquipment.png

 

Note: The equipment should be added first in Production > SMT Machine part Traceability > Machine Registry module. The suggested naming format for Workstation.

 

By Shop Floor Location

Format: Area Location  +  Production Zone - Placement Machine Example: F2-CP6B Explanation: Fuji CP6B placement machine is located on 2nd Floor.

 

By Production Process

Format: Production Process + Line/Zone - Placement Machine Example: S2-CP6A

Explanation: Fuji CP6A placement machine is located at SMT Line 2.

 

By Placement of machine model with associated serial number

Format: Placement machine model – Placement machine serial number

Example: CP6-SN12345

Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.

 

Hide WorkStation

Figure 7: Hide Workstation

PSU HideWorkstation.png

1. Select Hide WorkStation.

2. Select a WorkStation (The Workstation should be at visible status)

3. Select Send to hide the WorkStation or Cancel to exit.

 

 

Recover WorkStation

Figure 8: Recover Work Station

TSU RecoverWorkStation.png

1. Select Recover WorkStation.

2. Select a WorkStation (The Workstation is at hidden status).

3. Select Send to recover the WorkStation or Cancel to exit.

 

Hide/Recover Production Line

If you need to hide the obsolete PTS Production Lines, then you can do that by yourself by following the steps. Otherwise, the MES Support team will be able to help you out if you need to do something at the database level. 

Figure 9: Hide/Recover Production Line

TSU Hide RecoverProductionLine.png

 

1. Select Hide/Recover Production line.

 

Figure 10: Hide a Production Line

TSU HideaProductionLine.png

 

2. Select a production line (The line is in offline and visible status) then select Hide Production Line.

3. Select OK to hide the production line or Cancel to exit.

4. Select a production line (The line is in offline and hidden status) then select Recover Production Line.

5. Select OK to recover the production line or Cancel to exit.

Note: The online production line is not allowed to be hidden. Please set the production line to "off-line" before hiding it.

 

Add WorkStation

This module allows the user to add or remove workstation(s) from the production line.

 

 

Adding Workstation into a Production Line

Figure 11: Add Workstation into a Production Line

TSU AddWorkstationintoProductionLine.png

 

1. Select the production line from the production Line list.

2. Open the pop-up menu by right-clicking on the line name then select Add Workstation menu. Select the workstation name from the Workstation name pull-down list to add to the specific production line.

3. Select Add to add the workstation.

 

Figure 12: Add Workstation- Set Button

TSU AddWorkstation-Set Button.png

 

Note 1: The selected production line must be offline for workstation addition or removal.

Note 2: The Workstation Name will be auto-completed after entering the first 4 characters.

 

Removing Workstation from a Production Line

 

Figure 13: Remove Workstation

TSU RemoveWorkstation.png

 

1. Select the production line from the production Line list menu.

2. Select the workstation name from the Workstation pull-down list which is under "In Use."

3. Open the pop-up menu by right-clicking on the workstation then select the Remove Workstation menu.

4. Select OK to remove the Workstation from this production line or select Cancel to exit.

 

Workstation Maintenance

 

Figure 14: Workstation Maintenance

TSU WorkstationMaintenance.png

 

1. Select the production line from the production line list.

2. Select the workstation from the workstation(s) list.

3. Open the pop-up menu by right-clicking then select the Workstation Maintenance option.

4. Renaming: Fill in a new workstation name in the New Workstation field and then select Change to rename the selected workstation name.

5. Equipment: Select the Equipment, then select Change to reset the Workstation type.

 

Figure 15: Workstation Maintenance- Detail

TSU WorkstationMaintenance-Detail.png


Note: The workstation can be renamed only when the production line is in "offline" mode.

(See Set Production Off-Line)

 

Workstation Sequence

The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.

 

Figure 16: Workstation Sequence

TSU WorkstationSequence.png

1. Select the production line from the production Line list.

2. Select the workstation from the workstation(s) list.

3. Select Workstation Sequence to shift up the Workstation process sequence.

Note:The workstation process sequence goes from down to up and is allowed under the Workstation Sequence option. Please move each workstation to the correct workstation process sequence if required. 

 


Workstation Setup

This module allows the user to set up the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.

 

Figure 17: Workstation Sequence in a Production Line- After

TSU WorkstationSet-UpParameters.png


1. Select the production line from the production Line list.

2. Select the workstation to be set up, then right-click to open the pop-up menu.

3. Select Workstation Setup.

 

Workstation Setup Parameters

1. Barcode Regulation: (Recommended)

Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.

For example: The plant set the Barcode Regulation: ^JZ[0-9]{6}$. Then the barcode can be JZ057867,JZ057868. {6} means the number of characters.[0-9] means the characters can be numbers from 0 to 9.

The regulation applies to the Regular expression, please click here to see more about the Regular Expression.

2. Scanning Behavior: (Compulsory)

  • Scan by Later Workstation: All workstation material placements can be recorded with the next Workstation(s).
  • Must Scan At this Workstation: All workstation material placements are required to be recorded at this Workstation before reaching and/or scanning at the next Workstation(s).
  • Scan for Previous Workstation: All these workstation material placements will be recorded with the previous Workstation placements.

3. Scan Board/Panel: (Compulsory)

Select the Scan Board/Panel for both 1st Side and 2nd Side

  • Board: Each individual PCB board number.
  • Panel: Each PCB panel number.
  • Serial: Each PCB serial number.

4. Scan Extra S/N: (Compulsory)

Define if extra serial needs to be scanned. If it is required to scan the PCB board's additional barcodes such as the package label, select Yes. Default is No.

5. S/N Regulation: (Required if Scan Extra S/N is Yes)

Define the serial number barcode regulation.

6. Completed MSD: (Required if MSD control is needed)

Default is No.

Note: MSD control is only applied to the workstation(s) prior reflowing process.

7. Scan Side: (Required if Scan board/Panel is "Yes")

Define which production side(s) need to be scanned.

  • 1st Side: First PCB production side or One PCB production side.

I.e. Such as PCBs TOP side production only which does only have material placements on one PCB side.

  • 2nd Side: Second PCB production side.

I.e. Such as the TOP side can be called the 2nd Side as it is the second production side after the BOTTOM side placement is finished.

  • 1st& 2nd Side: Top and Bottom side.

I.e. Both production sides are required to be scanned at the same Workstation.

8. Scan Material: (Compulsory)

  • Select Material Barcode (For plants that used PTS format material label that included a unique printed PTS material barcode).
  • Select SSCI P/N (For plants which might be used standard plant-approved/developed material label that included printed SSCI Part Number barcode).
  • Select Manufacturer P/N (For a plant that might use the manufacturer-provided label that included printed manufacturer Part Number barcode)

9. Process: (Compulsory)

Select the type of process for this workstation:

a. SMT: For SMT Machine workstation.

b. Hand Load: For Manual process workstation.

c. AI: For Auto Insertion workstation.

Note: Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.

10. Device ID: (Optional)

Enter any integer from 0 to 999 according to the SFDC setup. If the generic attribute is set for higher device numbers using the base 34 system, the device ID may go from 0 to ZZZ.

11. Select Change to set up this workstation.

12. Select History to check the log for the change of setup parameters.

 

Define Pick List

This module allows the user to assign the early prepared/loaded SMT placement program to a Workstation under the specific Production Line.

Figure 18: Select Picklist for Workstation

TSU SelectPicklistWorkstation.png

1. Select the production line from the production Line list.

2. Select the workstation, then right-click to open the pop-up menu.

3. Select Define Picklist.

4. Enter the keywords for the Picklist name.

5. Select Search to search Picklist name.

6. Select the Picklist name to view material placements with reference designator listing.

 

Figure 19: Show Picklist Option

TSU ShowPicklistOption.png

 

7. Select +  to assign the selected picklist to the Workstation. Note: For additional Picklist information, see the SMT Part Traceability work instruction.  

Location mapping

This sub-module is designed to map the Traceability workstation with the SFDC location so that SFDC will forward serial number information to the pre-mapped Traceability workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.

To map a Traceability workstation with an SFDC location, please select the workstation of a production line, right-click to open the pop-up menu then click on Location Mapping.


Figure 20: Location Mapping Interface

TSU LocationMappingInterface.png


1. To update an existing mapping, double click on existing mapping; edit the information, then select Update.

2. To delete the existing mapping, select Delete.

3. To configure a new mapping, select Add, and a new line will be created.

  • MES User ID (Mandatory): SFDC user ID at MES. Select from the drop-down list.
  • Location Name (Mandatory): Fill in the SFDC location name that to be mapped with the selected PTS workstation.
  • Device ID (Optional): Fill in SFDC Device ID.
  • Select Update to complete the mapping or Cancel to exit.

 

Set Production On/Off-Line

Set Production On-Line

Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.

 

Figure 21: Work Order Selection When Set Production On-Line

TSU WOSelectionOn-Line.png

 

1. Select the production line to be set online from the production Line list.

2. Open the pop-up menu by right-clicking, and then selecting Set Production On Line.

3. Enter a released Work Order number, if known, or Select the work order from the list by selecting Show.

4. Select the Work Order (you can view the BOM detail by selecting the + at the left). 5. Select the   +  at the right to select the Work order. 6. Select Check in the BOM/PL column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.

 

  • Items that do not exist in BOM

To compare and validate all material placements in the SMT placement program (i.e. PickList) that do not exist in ERP BOM.

  • Items that do not exist in PickList

To compare and validate all material placements in ERP BOM that do not exist in the SMT placement program (i.e. PickList).

7. Fill in the required Work Order with the associated production ECN.

8. Select Online to set the production line online after confirming the Work Order and ECN selection.

Note: If the work order BOM components do not match the defined picklist, the user will need to follow confirmation and update accordingly.

  • Confirm that the Work Order you enter/select is associated with the latest ECN.
  • Confirm the Picklist defined is correct.

 

Set Production Off-Line

Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.

1. Select the production line to be set online from the production Line list.

2. Open the pop-up menu by right-clicking then select Set Production offline.

3. Choose Set Production On/Off-Line functional module.

4. Select Off-Line to set the line offline.

 

Figure 22: Setup Production Offline

TSU SetupProductionOffline.png

 

Load All

This module allows the user to load all materials to the workstation under the following conditions.

1. Set the production line offline (do not unload materials).

2. Change the setting for the workstation if needed.

3. Set the production line to online again.

4. The user can use the "Load All" function to load all materials to the workstation.

Note 1: The user can only load all when not using the unload function.

Note 2: If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.

 

1. Set the production line online from the Production Line list.

2. Open the workstation lists by selecting the   +  at the left. 3. Open the pop-up menu by right-clicking on the workstation, and then selecting Load All.

4. The information will display if the Load All function succeeds.

5. The user can check the loaded material on the page "Load Material Report."