Difference between revisions of "Production Control"
Line 104: | Line 104: | ||
| | ||
− | == <span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span style="font-size:large;">Line Sequencing</span></span></span></span></span></span></span></span> == | + | |
+ | == <span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span class="mw-headline" id="Line_Sequencing"><span style="font-size:large;">Line Sequencing</span></span></span></span></span></span></span></span></span> == | ||
{| cellpadding="10" cellspacing="0" style="border-style:solid; border-color:blue; border-width:2px;" | {| cellpadding="10" cellspacing="0" style="border-style:solid; border-color:blue; border-width:2px;" | ||
|- | |- | ||
− | | '''[[SOP-5-I-MES0082-Line_Sequencing| | + | | '''[[SOP-5-I-MES0082-Line_Sequencing|42Q-MES0082 Line Sequencing]]''' |
The Line Sequencing (LS) System was designed and developed to plan efficiently each production line for the production plants of 42Q. LS can trace a production time estimative in all the factories lines, considering some variables, e.g.: schedule, the capacity of each line to produce certain products, configuration time of a line before the start of each production. If a new request is solicited by a client, it can have the delivery time estimated by the system in a short time. | The Line Sequencing (LS) System was designed and developed to plan efficiently each production line for the production plants of 42Q. LS can trace a production time estimative in all the factories lines, considering some variables, e.g.: schedule, the capacity of each line to produce certain products, configuration time of a line before the start of each production. If a new request is solicited by a client, it can have the delivery time estimated by the system in a short time. | ||
Revision as of 18:02, 2 August 2022
42Q Home > Shop Floor Control > Production Control
Contents
Shop Order Control
42Q-MES0026 Shop Order Control
The Shop Order Control module provides various resources for the creation and maintenance of work orders. |
Traceability Setup
42Q-MES0024 Traceability Setup
The Traceability Setup module described here contains information for every detail of the production setup. Included in this module are setup procedures for multiple scenarios, production line handling, workstation handling, and picklist definitions. |
Serialized Item Tracker
42Q-MES0025 Serialized Item Tracker
The SIT module described here is designed to import/create a large number of components in a series (Serial Numbers) that will be used later in the manufacturing process. |
Multi-Level Browser/Pack
42Q-MES0027 Multi-Level Browser/Pack
The Multilevel Browser/Pack module described here is used for registering and storing serial numbers placed in a container, box, or package that will be sent to customers once production is complete. |
Kit Verify
42Q-MES0078 Kit Verify
The Kit Verify module covers KV Layout Configuration and KV Control. Kit Verify allows users to validate all components in a kit and provides a visual layout mapping to aid in component placement. |
Incoming Traceability Material Labeling
42Q-MES0028 Incoming Traceability Material Labeling
This module is the foundation of traceability. Prior to production, the warehouse staff must ensure that all the materials received have correct RT (Receipt Traveler) numbers. Each time the warehouse receives materials, there will be RT records downloaded from an Oracle Application to the PTS database server. Then the corresponding RT sheet numbers can be found and printed for the received materials. Incoming material labeling is defined in this section. The material barcode, once scanned, makes it possible to trace components in EMS (Electronic Manufacturing System). This is possible because the material barcode uniquely identifies the PCB (Printed Circuit Board) and its components. Through this process, the manufacturer name/vendor code, manufacturer part number, and lot code of each component can be traced. This module also allows the user to manage AMLs (Approved Manufacturer List) and manufacturer’s information. |
Solder Paste Material Control
42Q-MES0153 Solder Paste Material Control
Solder Paste is an application able to help plants to control the storage and use of Solder Paste materials to avoid human errors and lapses. The project has the standard process and creates error-proofing of Solder Paste control, to ensure plants comply with the varying Solder Paste part number’s storage life and use life limits, and ensuring a constant environment, to stop out-of-specs solder paste from being used in production. |
Line Sequencing
42Q-MES0082 Line Sequencing
The Line Sequencing (LS) System was designed and developed to plan efficiently each production line for the production plants of 42Q. LS can trace a production time estimative in all the factories lines, considering some variables, e.g.: schedule, the capacity of each line to produce certain products, configuration time of a line before the start of each production. If a new request is solicited by a client, it can have the delivery time estimated by the system in a short time. |
Shop Order Scheduling
SOP-42Q-MES0140 Shop Order Scheduling
Shop Order Scheduling provides the ability to define/update the Shop Order sequence. Shop Order scheduling portlet was developed for better attend our customers and the Sales area. The user is able to prioritize shop orders (work orders) and drive manufacturing to produce based upon a defined priority list of shop orders. |
Reprocessing Defect
SOP-42Q-MES0149 Reprocessing Defect The Reprocessing Defect is a 42Q portlet, which provides the users with the ability to diagnose and capture the failure analysis, reducing the repair time and mitigating human error in manual tracking, while systematically capturing and tracking across multiple systems, such as NCMR (Non-Conformance Material Request) and MESWeb without duplicate data entry. |
Production Scheduling
SOP-42Q-MES0154 Production Scheduling Production Scheduling is a 42Q portlet, which provides the users with the ability to schedule when shop orders are expected to run in the Manufacturing Lines. |