Difference between revisions of "SOP-42Q-MES0041 100 Traceability"

From 42Q
Jump to navigation Jump to search
Line 8: Line 8:
 
''This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.''
 
''This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.''
  
= <span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production">Production</span></span></span></span></span></span> =
+
= <span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production"><span class="mw-headline" id="Production">Production</span></span></span></span></span></span></span> =
  
The Parts Traceability System (PTS) is one of the applications within the MES suite of tools. It was developed to meet the demands of customers to provide component level traceability as well as to provide quality controls. This system plays a very important role in automating the production lines and raising productivity as well as enforcing rigorous product quality control. It has been implemented in many plants across the globe. This application and the features it provides continue to evolve, as the changing technologies used for the SMT process equipment tools become more detailed and rich in functionality.
+
The Parts Traceability System (PTS) is one of the applications within the MES suite of tools. It was developed to meet the demands of customers to provide component level traceability as well as to provide quality controls. This system plays a very important role in automating the production lines and raising productivity as well as enforcing rigorous product quality control. It has been implemented in many plants across the globe. This application and the features it provides continue to evolve, as the changing technologies used for the SMT process equipment tools become more detailed and rich in functionality.<span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id="">&nbsp;</span></span></span></span></span></span>
  
== <span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id=""><span class="mw-headline" id="">&nbsp;</span></span></span></span></span> ==
+
= <span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement">Hand Placement</span></span></span></span></span></span></span> =
 
 
= <span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement"><span class="mw-headline" id="Hand_Placement">Hand Placement</span></span></span></span></span></span> =
 
  
 
1. To access the Hand Placement page, navigate to '''''Production > 100% Traceability > Hand Placement''.'''
 
1. To access the Hand Placement page, navigate to '''''Production > 100% Traceability > Hand Placement''.'''
Line 42: Line 40:
 
<br/> &nbsp;
 
<br/> &nbsp;
  
= <span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework">Fujitrax Rework</span></span></span></span></span></span> =
+
= <span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework"><span class="mw-headline" id="Fujitrax_Rework">Fujitrax Rework</span></span></span></span></span></span></span> =
  
 
'''Figure 3: Fujitrax Rework'''
 
'''Figure 3: Fujitrax Rework'''
Line 62: Line 60:
 
&nbsp;
 
&nbsp;
  
== <span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History">Document Revision History</span></span></span></span></span></span> ==
+
= <span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History"><span class="mw-headline" id="Document_Revision_History">Document Revision History</span></span></span></span></span></span></span> =
  
 
{| border="2" cellpadding="4" cellspacing="0" width="89%"
 
{| border="2" cellpadding="4" cellspacing="0" width="89%"

Revision as of 01:18, 26 November 2020

42Q Home > Production > 100% Traceability > Hand Placement & Fujitrax Rework
42Q Logo.jpg

 

PTS
Hand Placement & Fujitrax Rework
Version MES15 Portal 1.0
Work Instruction

 

This Work Instruction is 42Q's corporate standard.
This document is under revision control. The latest revision is located on Intranet.
Once printed it is an uncontrolled copy. All alterations to this work instruction require approval.
Contact the IT Global Education and Training Department to submit suggested alterations and or updates.

This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.

Production

The Parts Traceability System (PTS) is one of the applications within the MES suite of tools. It was developed to meet the demands of customers to provide component level traceability as well as to provide quality controls. This system plays a very important role in automating the production lines and raising productivity as well as enforcing rigorous product quality control. It has been implemented in many plants across the globe. This application and the features it provides continue to evolve, as the changing technologies used for the SMT process equipment tools become more detailed and rich in functionality. 

Hand Placement

1. To access the Hand Placement page, navigate to Production > 100% Traceability > Hand Placement.


Figure 1: Hand Placement

Figure 1- Hand Placement.png


 

2. Choose the Production Line and Workstation, then enter the Board Barcode and select Submit. If the material is sufficient a "Successful" message will display in the right section of the Portlet. This section will also display the Scan Time, Board Barcode, and the Scanned By information.

3. If material is not sufficient an "Error-Workstation material has run out when scan!" message will display. This is because some things need to be verified before using the 100% traceability hand placement function.

NOTE:

  • First, the chosen Production Line must be online. Also, users can add a Production Line and Workstation at other Portlets in PTS and then set it online.
  • Second, the Part Number must set 100% Traceability at PN Extra Info page.
  • In the event of an error, the user must load material of the same Part Number for scanning. The user can select the Load Material Portlet to load material to a workstation. After this the user can repeat the actions: Choose Production Line, Workstation, and input a Board Barcode for scanning. A dialog box will display. The user can choose the Old Component and New Component from the corresponding Designator.

 

Figure 2: Hand Placement: P/N Extra Information

SOP-5-I-MES0041-C Hand Placement PN Extra Information.jpg


 

Fujitrax Rework

Figure 3: Fujitrax Rework

Figure 3- Fujitrax Rework.png

 

 

 

1. Enter the Board S/N, and Designator. The old component and lot code will display.

2. Enter the New Component and Remark.

3. Select Submit.

 

Document Revision History

Date Author Title Version Change Reference
08/01/13 Helena Wang Technical Writer 1.0 Initial SO Work Instruction
02/17/14 Ashley Martin Technical Writer 1.0 Review and Format
02/28/14 Elaine Fonaro Technical Writer 1.0 Format for WIKI
12/08/16 Martha Jordan Technical Writer 1.0 42Q Format