Difference between revisions of "How to Leak Scan Board"
Helena wang (talk | contribs) |
Helena wang (talk | contribs) |
||
Line 49: | Line 49: | ||
| | ||
+ | |||
Line 55: | Line 56: | ||
| | ||
− | Go to '''Administration > Traceability Administration > System Setting''', at the '''Others''' tab, set the ''' | + | Go to '''Administration > Traceability Administration > System Setting''', at the '''Others''' tab, set the '''Allow Leak Scanning Board '''='''YES''' |
'''Figure : System Setting - Allow Leak Scanning Board''' | '''Figure : System Setting - Allow Leak Scanning Board''' | ||
− | [[File:Leak scanning system setting.png|border|800px]] | + | [[File:Leak scanning system setting.png|border|800px|Leak scanning system setting.png]] |
== Workstation Setup == | == Workstation Setup == |
Revision as of 06:38, 26 June 2020
Contents
How to Leak Scan Board
Background
42Q PTS production scanning has a strong process(need scan the board at the previous workstation first, can not skip workstation when scan board ) that can avoid scanning board records missing. Most PTS plants are fine with this function.
But some plants use two PTS production lines to produce the PCB board top & bottom side separately (In different lines).
For Example: Product has B and T two sides. Plants need to create two workstations separately for the B / T side. Sometimes they already processed the B side in another production line(Line1) and then they just need to process the T side in the current line(Line2) and the current workstation with others workstation not scan board .
Detailed production lines setting:
PTS Production Line 1
First Workstation: L1 SP (Scanned By Later Workstation)
Second Workstation: L1 AIMEX_B (Scan For Previous Workstation) First Scanning
Third workstation: L1 AIMEX_T (Scan For Previous Workstation)
PTS Production Line 2
First Workstation: L2 SP (Scanned By Later Workstation)
Second Workstation: L2 AIMEX_B (Scan For Previous Workstation)
Third workstation: L2 AIMEX_T (Scan For Previous Workstation) Second Scanning
Before this enhancement, production will prompts "Previous WS not scanned." error message when scan board in line2.
Solution
- First, supply a new configuration item ‘Allow Leak Scanning Board‘ inPTS System Setting function.
- PTS Workstation Setup function to add a new configuration switch item named 'Allow Leak Scanning Board'.
- Improve the Scan Board function, and only when switch 'Allow Leak Scanning Board' in System Setting function and switch 'Allow Leak Scanning Board ' in Workstation Setup function are all in opened status(Value is Yes) the scanning board allows leak scanning for current workstation.
How to operate in 42Q
System Setting
Go to Administration > Traceability Administration > System Setting, at the Others tab, set the Allow Leak Scanning Board =YES
Figure : System Setting - Allow Leak Scanning Board
Workstation Setup
Go to Shop Floor Control > Production Control > Traceability Setup.
At the module, manage the Production lines and workstations.
For a Leak scanning board, this setting is important for all workstations.
Right click on the workstation to open the menu, then select Workstation Setup to set the workstation configuration.
After setting all the workstations, please set the lines on line.
This is an example of the two production lines with three workstations each.
Touch
- Load all the materials to all workstations at the Load material function.
- Scan one Board for the B side at the station L1AIMEX-B (Production Line1 TestLine1,B side) at theScan board function.
- Scan one Board with the same barcode of B side for the T side at the station L2 AIMEX-T (Production Line2 TestLine2, T side) at thescan board function.
- Go to theLoad material report to check the material quantity for Production line2(TestLine2), the quantity of the material for station L2 AIMEX-T is reduced, but the materials quantity for the other two stations (L2 SP, L2 AIMEX-B) are not reduced . This step is optional.
Figure: An example for scan board
Revision History
Date | Author | Title | Version | Change Reference | Approved By |
4/16/2020 | Helena Wang | Technical Writer | A1 | This is the first version |