Difference between revisions of "SOP-42Q-MES0024 Traceability Setup"

From 42Q
Jump to navigation Jump to search
Line 1: Line 1:
<small>[[42Q Cloud-Based MES/MOMS|42Q Home]] &gt; [[Shop Floor Control]] &gt; [[Production Control]] &gt; Production Setup</small><br>[[Image:42Q Logo.jpg]]<br>
 
  
<br>  
+
<small>[[42Q_Cloud-Based_MES/MOMS|42Q Home]] > [[Shop_Floor_Control|Shop Floor Control]] > [[Production_Control|Production Control]] > Production Setup</small><br/> [[File:42Q Logo.jpg|RTENOTITLE]]
<center>'''PTS''' </center> <center>'''PTS Production Setup''' </center> <center>'''Version MES15 Portal 1.0''' </center> <center>'''Work Instruction''' </center>  
+
 
<br>
+
&nbsp;
 +
 
 +
&nbsp;
 +
 
 +
&nbsp;
 +
<center>'''PTS'''</center> <center>'''PTS Production Setup'''</center> <center>'''Version MES15 Portal 1.0'''</center> <center>'''Work Instruction'''</center>  
 +
&nbsp;
 
<center>This Work Instruction is 42Q's corporate standard.</center> <center>This document is under revision control. The latest revision is located on Intranet.</center> <center>Once printed it is an uncontrolled copy. All alterations to this work instruction require approval.</center> <center>Contact the IT Global Education and Training Department to submit suggested alterations and or updates.</center>  
 
<center>This Work Instruction is 42Q's corporate standard.</center> <center>This document is under revision control. The latest revision is located on Intranet.</center> <center>Once printed it is an uncontrolled copy. All alterations to this work instruction require approval.</center> <center>Contact the IT Global Education and Training Department to submit suggested alterations and or updates.</center>  
''This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.''  
+
''This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.''
  
== SFDC Production Control ==
+
== SFDC Production Control ==
  
As its name implies, the Shop Floor Data Collection (SFDC) system is responsible for the collection of data from the shop floor. The collected information is then stored in the Manufacturing Execution System (MES). Specifically, the real-time information collected by SFDC is utilized by Reporting and MES Web to create quality control reports. The SFDC system uses manual and automated barcode scanning to monitor and collect data for a product line or plant. Thus SFDC plays an important role in maintaining unit histories and directing product movement on the manufacturing floor.  
+
As its name implies, the Shop Floor Data Collection (SFDC) system is responsible for the collection of data from the shop floor. The collected information is then stored in the Manufacturing Execution System (MES). Specifically, the real-time information collected by SFDC is utilized by Reporting and MES Web to create quality control reports. The SFDC system uses manual and automated barcode scanning to monitor and collect data for a product line or plant. Thus SFDC plays an important role in maintaining unit histories and directing product movement on the manufacturing floor.
  
The system provides Access Control between the modules of the application, including the functionalities of each screen. The current version has an SFDC Configuration page which provides access to all sub modules pages and its functionalities (view, add, edit, delete, print and generate output file).  
+
The system provides Access Control between the modules of the application, including the functionalities of each screen. The current version has an SFDC Configuration page which provides access to all sub modules pages and its functionalities (view, add, edit, delete, print and generate output file).
  
'''General Notes'''  
+
'''General Notes'''
  
*This Work Instruction is a basic general training guide and is not meant to teach the process flow for individual plant or department functionality. Individual 42Q sites may have minor or specific process changes that will be documented at the site level.
+
*This Work Instruction is a basic general training guide and is not meant to teach the process flow for individual plant or department functionality. Individual 42Q sites may have minor or specific process changes that will be documented at the site level.  
  
'''Assumptions'''  
+
'''Assumptions'''
  
 
*Availability of SMT material placement program (e.g. Fuji SMT job program) or Hand load material placement (e.g. Material items and associated reference designator under Hand load operation).  
 
*Availability of SMT material placement program (e.g. Fuji SMT job program) or Hand load material placement (e.g. Material items and associated reference designator under Hand load operation).  
 
*Serial number printed on board prior SMT and/or Hand load operation process.  
 
*Serial number printed on board prior SMT and/or Hand load operation process.  
*Each SMT machine has been assigned a unique name for identification purpose. (i.e. Workstation name)
+
*Each SMT machine has been assigned a unique name for identification purpose. (i.e. Workstation name)  
  
'''Prerequisites'''  
+
'''Prerequisites'''
  
1. Understand PTS terms definition from Glossary '''SOP-5-I-MES0044-C_RA_PTS GLOSSARY'''<br>
+
1. Understand PTS terms definition from Glossary '''SOP-5-I-MES0044-C_RA_PTS GLOSSARY'''
  
2. Pick List has been obtained from plant engineering and uploaded into PTS, for EZ-Pick List – Refer to '''SOP-5-I-MES0049'''  
+
2. Pick List has been obtained from plant engineering and uploaded into PTS, for EZ-Pick List – Refer to '''SOP-5-I-MES0049'''
  
'''Overview'''  
+
'''Overview'''
  
This overview explains the process for production setup in PTSWEB base on the following two different production setup scenarios:  
+
This overview explains the process for production setup in PTSWEB base on the following two different production setup scenarios:
  
'''Scenario 1'''  
+
'''Scenario 1'''
  
Production Setup for a new (or previous built) product item on a new shop floor production line, suggested following the steps below in PTS:  
+
Production Setup for a new (or previous built) product item on a new shop floor production line, suggested following the steps below in PTS:
  
{| width="100%" cellspacing="0" cellpadding="4" border="2"
+
{| border="2" cellpadding="4" cellspacing="0" width="100%"
 
|-
 
|-
| 1.<br>Convert and upload SMT Picklist into PTS.  
+
| 1.<br/> Convert and upload SMT Picklist into PTS.
 
| ''Refer SOP-5-I-MES0049, Define EZ Pick List.''
 
| ''Refer SOP-5-I-MES0049, Define EZ Pick List.''
 
|-
 
|-
| 2.<br>Create a New Production Line.  
+
| 2.<br/> Create a New Production Line.
 
| ''Refer to 2.1 Create a New Production Line.''
 
| ''Refer to 2.1 Create a New Production Line.''
 
|-
 
|-
| 3.<br>Create all required Workstation(S).  
+
| 3.<br/> Create all required Workstation(S).
 
| ''Refer to 2.5.1 Create a New Workstation.''
 
| ''Refer to 2.5.1 Create a New Workstation.''
 
|-
 
|-
| 4.<br>Add the Workstations into the Production Line by sequence.  
+
| 4.<br/> Add the Workstations into the Production Line by sequence.
 
| ''Refer 2.6.1 Add a Workstation into a Production Line.''
 
| ''Refer 2.6.1 Add a Workstation into a Production Line.''
 
|-
 
|-
| 5.<br>Define Workstation Process Sequence in a Production Line.  
+
| 5.<br/> Define Workstation Process Sequence in a Production Line.
 
| ''Refer to 2.7 Workstation Sequence.''
 
| ''Refer to 2.7 Workstation Sequence.''
 
|-
 
|-
| 6.<br>Define Workstation Parameters for each added Workstation(s).  
+
| 6.<br/> Define Workstation Parameters for each added Workstation(s).
 
| ''Refer 2.8 Workstation Setup.''
 
| ''Refer 2.8 Workstation Setup.''
 
|-
 
|-
| 7.<br>Define Picklist for each above added Workstation(s).  
+
| 7.<br/> Define Picklist for each above added Workstation(s).
 
| ''Refer 2.9 Define Picklist.''
 
| ''Refer 2.9 Define Picklist.''
 
|-
 
|-
| 8.<br>Define Auto-Scan Mapping. (Optional)  
+
| 8.<br/> Define Auto-Scan Mapping. (Optional)
 
| ''Refer 2.10 Location Mapping.''
 
| ''Refer 2.10 Location Mapping.''
 
|-
 
|-
| 9.<br>Set Production Online.  
+
| 9.<br/> Set Production Online.
 
| ''Refer 2.11 Set Production On/Off-Line.''
 
| ''Refer 2.11 Set Production On/Off-Line.''
 
|}
 
|}
  
'''Scenario 2'''  
+
'''Scenario 2'''
  
Production Setup for a previous built production item on where previous built shop floor production line, suggested to follow the steps below in PTS:  
+
Production Setup for a previous built production item on where previous built shop floor production line, suggested to follow the steps below in PTS:
  
{| width="100%" cellspacing="0" cellpadding="4" border="2"
+
{| border="2" cellpadding="4" cellspacing="0" width="100%"
 
|-
 
|-
| 1.<br>Convert and upload SMT Picklist into PTS.  
+
| 1.<br/> Convert and upload SMT Picklist into PTS.
 
| ''Refer SOP-5-I-PTS0014, Define EZ Pick List.''
 
| ''Refer SOP-5-I-PTS0014, Define EZ Pick List.''
 
|-
 
|-
| 2.<br>Define Picklist for each Workstation which corresponding to the associated Production Line.  
+
| 2.<br/> Define Picklist for each Workstation which corresponding to the associated Production Line.
 
| ''Refer 2.9 Define Picklist.''
 
| ''Refer 2.9 Define Picklist.''
 
|-
 
|-
| 3.<br>Set Production Online.  
+
| 3.<br/> Set Production Online.
 
| ''Refer 2.11 Set Production On/Off-Line.''
 
| ''Refer 2.11 Set Production On/Off-Line.''
 
|}
 
|}
  
'''NOTE:'''  
+
'''NOTE:'''
 +
 
 +
This work instruction is a general training guide and is not intended to provide a shop floor production process flow for all individual plants or departments.
 +
 
 +
'''NOTE:'''
 +
 
 +
Please avoid setting up a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming setup for one specific assembly exclusively.
 +
 
 +
== Production Setup ==
  
This work instruction is a general training guide and is not intended to provide a shop floor production process flow for all individual plants or departments.
+
1. To access the Production Setup page, navigate to '''Shop Floor Control'''
 +
<nowiki>></nowiki>
  
'''NOTE:'''  
+
'''Production Control'''.
  
Please avoid setting up a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming setup for one specific assembly exclusively.
+
'''Figure 1: Production Set-Up (PTS)'''
  
== Production Setup ==
+
[[File:SOP-5-I-MES0024-C Production-Setup.jpg|RTENOTITLE]]
  
1. To access the Production Setup page, navigate to '''Shop Floor Control <nowiki>></nowiki> Production Control'''.
+
&nbsp;
  
'''Figure 1: Production Set-Up (PTS)'''
+
&nbsp;
  
[[Image:SOP-5-I-MES0024-C Production-Setup.jpg]]<br>
+
=== Create a New Production Line ===
  
<br>
+
'''Figure 2: Create New Line'''
  
<br>
+
[[File:SOP-5-I-MES0024-C Create-New-Line.jpg|RTENOTITLE]]
  
=== Create a New Production Line  ===
+
&nbsp;
  
'''Figure 2: Create New Line'''  
+
1. Select '''Create Production Line'''.
  
[[Image:SOP-5-I-MES0024-C Create-New-Line.jpg]]<br>
+
2. Enter the new Production Line Name. (See following section for naming format suggestions).
  
<br>
+
3. Select '''Create''' to confirm addition.
  
1. Select '''Create Production Line'''.  
+
Note the following naming conventions for the Production Line.
  
2. Enter the new Production Line Name. (See following section for naming format suggestions).
+
'''By Shop Floor Location'''
  
3. Select '''Create''' to confirm addition.
+
Format: Area Location
 +
<nowiki>+</nowiki>
  
Note the following naming conventions for the Production Line.
+
Production Zone - Production Part Number - Production Process - Production Side
  
'''By Shop Floor Location'''
+
Area Location: F (Floor), G (Ground)
  
Format: Area Location <nowiki>+</nowiki> Production Zone - Production Part Number - Production Process - Production Side
+
Production Zone: Floor level or zone area in production either in alpha or number format.
  
Area Location: F (Floor), G (Ground)
+
Production Part Number: as named.
  
Production Zone: Floor level or zone area in production either in alpha or number format.
+
Production Process: S (SMT), H (Hand Load)
  
Production Part Number: as named.
+
Production Side: T (Top), B (Bottom)
  
Production Process: S (SMT), H (Hand Load)
+
Example: F2-ABC12345-S-T
  
Production Side: T (Top), B (Bottom)
+
Production Line for produc ABC12345 top side SMT production at 2<sup>nd</sup>floor'''.'''
  
Example: F2-ABC12345-S-T
+
'''By Production Process'''
  
Production Line for produc ABC12345 top side SMT production at 2<sup>nd</sup>floor'''.'''
+
Format: Production Process
 +
<nowiki>+</nowiki>
  
'''By Production Process'''
+
Production Zone – Production Part Number – Production Side
  
Format: Production Process <nowiki>+</nowiki> Production Zone – Production Part Number – Production Side
+
Production Process: S (SMT), H (Hand Load)
  
Production Process: S (SMT), H (Hand Load)
+
Production Zone: Floor level or zone area in production either in alpha or number format.
  
Production Zone: Floor level or zone area in production either in alpha or number format.  
+
Production Part Number: as named.
  
Production Part Number: as named.
+
Production Side: T (Top), B (Bottom)
  
Production Side: T (Top), B (Bottom)
+
Example: S2-ABC12345-T
  
Example: S2-ABC12345-T
+
Production Line for produc ABC12345 top side at SMT Line/Zone 2.
  
Production Line for produc ABC12345 top side at SMT Line/Zone 2.
+
=== Search a Production Line ===
  
=== Search a Production Line ===
+
'''Figure 3: Search Production Line'''
  
'''Figure 3: Search Production Line<br>'''
+
[[File:SOP-5-I-MES0024-C Search-Production-Line.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Search-Production-Line.jpg]]<br>
+
&nbsp;
  
<br>
+
1. Enter the production line name or key words in the Search Line Name field.
  
1. Enter the production line name or key words in the Search Line Name field.  
+
2. Select the line name from the list.
  
2. Select the line name from the list.  
+
3. The related production line will be listed in Production Line Available text box.
  
3. The related production line will be listed in Production Line Available text box.  
+
NOTE: Input the first 1 or 4 key words for the line name, then the line name will display.
  
NOTE: Input the first 1 or 4 key words for the line name, then the line name will display.
+
&nbsp;
  
<br>
+
=== Rename Production Line ===
  
=== Rename Production Line ===
+
'''Figure 4: Rename Production Line'''
  
'''Figure 4: Rename Production Line'''
+
[[File:SOP-5-I-MES0024-C Rename-Production-Line.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Rename-Production-Line.jpg]]<br>
+
&nbsp;
  
<br>
+
1. Select the production line from the Production Line list.
  
1. Select the production line from the Production Line list.  
+
2. Open the pop-up menu by Right-Clicking, and then select '''Rename Production Line'''.
  
2. Open the pop-up menu by Right-Clicking, and then select '''Rename Production Line'''.  
+
3. Enter the New Name in "New Production Line".
  
3. Enter the New Name in "New Production Line".  
+
4. Select '''Change''' to rename the production line.
  
4. Select '''Change''' to rename the production line.
+
&nbsp;
  
<br>
+
'''Figure 5: Rename Production Line Form'''
  
'''Figure 5: Rename Production Line Form'''
+
[[File:SOP-5-I-MES0024-C Rename-Production-Line-Form.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Rename-Production-Line-Form.jpg]]<br>
+
&nbsp;
  
<br>
+
NOTE''':''' Production line name can be changed only when the production line is in off-line mode.
  
NOTE''':''' Production line name can be changed only when the production line is in off-line mode.
+
&nbsp;
  
<br>
+
=== Hide/Recover Production Line ===
  
=== Hide/Recover Production Line ===
+
'''Figure 6: Hide/Recover Production Line'''
  
'''Figure 6: Hide/Recover Production Line'''
+
[[File:SOP-5-I-MES0024-C Hide-Recover-Production-Line.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Hide-Recover-Production-Line.jpg]]<br>
+
&nbsp;
  
<br>
+
1. Select '''Hide/Recover Production line'''.
  
1. Select '''Hide/Recover Production line'''.
+
&nbsp;
  
<br>
+
'''Figure 7: Hide a Production Line'''
  
'''Figure 7: Hide a Production Line'''
+
[[File:SOP-5-I-MES0024-C Hide-Production-Line.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Hide-Production-Line.jpg]]<br>
+
&nbsp;
  
<br>
+
2. Select a production line (The line is in offline and visible status) then select '''Hide Production Line'''.
  
2. Select a production line (The line is in offline and visible status) then select '''Hide Production Line'''.  
+
3. Select '''OK '''to hide the production line or '''Cancel '''to exit.
  
3. Select '''OK '''to hide the production line or '''Cancel '''to exit.
+
&nbsp;
  
<br>
+
'''Figure 8: Recover a Production Line'''
  
'''Figure 8: Recover a Production Line'''
+
[[File:SOP-5-I-MES0024-C Recover-Production-Line.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Recover-Production-Line.jpg]]<br>
+
&nbsp;
  
<br>
+
4. Select a production line (The line is in offline and hidden status) then select '''Recover Production Line.'''
  
4. Select a production line (The line is in offline and hidden status) then select '''Recover Production Line.'''  
+
5. Select '''OK''' to recover the production line or '''Cancel''' to exit.
  
5. Select '''OK''' to recover the production line or '''Cancel''' to exit.  
+
NOTE: The online production line not allowed to be hidden. Please set the production line to "off-line" before hiding it.
  
NOTE: The online production line not allowed to be hidden. Please set the production line to "off-line" before hiding it.
+
=== Workstation ===
  
=== Workstation ===
+
==== Create a New Workstation ====
  
==== Create a New Workstation ====
+
1. Select '''Create Workstation''' from the functional option menu. (See following section for naming format suggestions).
  
1. Select '''Create Workstation''' from the functional option menu. (See following section for naming format suggestions).  
+
2. '''Workstation Name''': Enter the workstation name.
  
2. '''Workstation Name''': Enter the workstation name.
+
3. Select the '''Equipment. '''(This is optional)
  
3. Select the '''Equipment. '''(This is optional)
+
4. Select '''Create''' to create the new workstation.
  
4. Select '''Create''' to create the new workstation.
+
&nbsp;
  
<br>
+
'''Figure 9: Workstation Name and Equipment'''
  
'''Figure 9: Workstation Name and Equipment'''
+
[[File:SOP-5-I-MES0024-C Workstation-Name-and-Equipment.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Workstation-Name-and-Equipment.jpg]]<br>
+
&nbsp;
  
<u></u><br>  
+
NOTE: The equipment should be added first in '''Production'''
 +
<nowiki>></nowiki>
  
NOTE: The equipment should be added first in '''Production <nowiki>></nowiki> SMT Machine part Traceability <nowiki>></nowiki> Machine Registry''' module.<br>Suggested naming format for Workstation
+
'''SMT Machine part Traceability'''
 +
<nowiki>></nowiki>
  
'''By Shop Floor Location'''  
+
'''Machine Registry''' module.<br/> Suggested naming format for Workstation
  
Format: Area Location <nowiki>+</nowiki> Production Zone - Placement Machine
+
'''By Shop Floor Location'''
  
Example: F2-CP6B
+
Format: Area Location
 +
<nowiki>+</nowiki>
  
Explanation: Fuji CP6B placement machine located at 2<sup>nd</sup> Floor.
+
Production Zone - Placement Machine
  
'''By Production Process'''
+
Example: F2-CP6B
  
Format: Production Process <nowiki>+</nowiki> Line/Zone - Placement Machine
+
Explanation: Fuji CP6B placement machine located at 2<sup>nd</sup> Floor.
  
Example: S2-CP6A
+
'''By Production Process'''
  
Explanation: Fuji CP6A placement machine located at SMT Line 2.
+
Format: Production Process
 +
<nowiki>+</nowiki>
  
'''By Placement machine model with associated serial number'''
+
Line/Zone - Placement Machine
  
Format: Placement machine model – Placement machine serial number
+
Example: S2-CP6A
  
Example: CP6-SN12345
+
Explanation: Fuji CP6A placement machine located at SMT Line 2.
  
Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.
+
'''By Placement machine model with associated serial number'''
  
==== Hide WorkStation  ====
+
Format: Placement machine model – Placement machine serial number
  
'''Figure 10: Hide Workstation'''
+
Example: CP6-SN12345
  
[[Image:SOP-5-I-MES0024-C Hide-Workstation.jpg]]<br>
+
Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.
  
<br>
+
==== Hide WorkStation ====
  
1. Select '''Hide WorkStation'''.
+
'''Figure 10: Hide Workstation'''
  
2. Select a WorkStation (The Workstation should be at visible status)
+
[[File:SOP-5-I-MES0024-C Hide-Workstation.jpg|RTENOTITLE]]
  
3. Select '''Send''' to hide the WorkStation or '''Cancel '''to exit.
+
&nbsp;
  
==== Recover WorkStation ====
+
1. Select '''Hide WorkStation'''.
  
'''Figure 11: Recover Work Station'''
+
2. Select a WorkStation (The Workstation should be at visible status)
  
[[Image:SOP-5-I-MES0024-C Recover-Workstation.jpg]]<br>
+
3. Select '''Send''' to hide the WorkStation or '''Cancel '''to exit.
  
<br>
+
==== Recover WorkStation ====
  
1. Select '''Recover WorkStation'''.
+
'''Figure 11: Recover Work Station'''
  
2. Select a WorkStation (The Workstation is at hidden status).  
+
[[File:SOP-5-I-MES0024-C Recover-Workstation.jpg|RTENOTITLE]]
  
3. Select '''Send''' to recover the WorkStation or '''Cancel''' to exit.
+
&nbsp;
  
<br>
+
1. Select '''Recover WorkStation'''.
  
=== Add WorkStation ===
+
2. Select a WorkStation (The Workstation is at hidden status).
  
This module allows the user to add or remove workstation(s) from production line.  
+
3. Select '''Send''' to recover the WorkStation or '''Cancel''' to exit.
  
==== Adding Workstation into a Production Line  ====
+
&nbsp;
  
'''Figure 12: Add Workstation into a Production Line'''
+
=== Add WorkStation ===
  
[[Image:SOP-5-I-MES0024-C Add-Workstation-Into-Production-Line.jpg]]<br>
+
This module allows the user to add or remove workstation(s) from production line.
  
<br>
+
==== Adding Workstation into a Production Line ====
  
1. Select the production line from the production Line list.
+
'''Figure 12: Add Workstation into a Production Line'''
  
2. Open the pop-up menu by right-clicking on the line name then select '''Add Workstation''' menu. Select the workstation name from Workstation name pull down list to add to the specific production line.  
+
[[File:SOP-5-I-MES0024-C Add-Workstation-Into-Production-Line.jpg|RTENOTITLE]]
  
3. Select '''Add''' to add the workstation.
+
&nbsp;
  
<br>
+
1. Select the production line from the production Line list.
  
'''Figure 13: Add Workstation- Set Button'''  
+
2. Open the pop-up menu by right-clicking on the line name then select '''Add Workstation''' menu. Select the workstation name from Workstation name pull down list to add to the specific production line.
  
[[Image:SOP-5-I-MES0024-C Add-Workstation-Set-Button.jpg]]<br>
+
3. Select '''Add''' to add the workstation.
  
<br>
+
&nbsp;
  
NOTE: The selected production line must be off-line for workstation addition or removal.
+
'''Figure 13: Add Workstation- Set Button'''
  
NOTE: The Workstation Name will auto-completed after entering the first 4 characters.  
+
[[File:SOP-5-I-MES0024-C Add-Workstation-Set-Button.jpg|RTENOTITLE]]
  
==== Removing Workstation from a Production Line  ====
+
&nbsp;
  
'''Figure 14: Remove Workstation'''
+
NOTE: The selected production line must be off-line for workstation addition or removal.
  
[[Image:SOP-5-I-MES0024-C Remove-Workstation.jpg]]<br>
+
NOTE: The Workstation Name will auto-completed after entering the first 4 characters.
  
<br>
+
==== Removing Workstation from a Production Line ====
  
<br>
+
'''Figure 14: Remove Workstation'''
  
1. Select the production line from the production Line list menu.  
+
[[File:SOP-5-I-MES0024-C Remove-Workstation.jpg|RTENOTITLE]]
  
2. Select the workstation name from Workstation pull down list which is under "In Use."
+
&nbsp;
  
3. Open the pop-up menu by right-clicking on the workstation then select '''Remove Workstation''' menu.
+
&nbsp;
  
4. Select '''OK''' to remove the Workstation from this production line or select '''Cancel''' to exit.  
+
1. Select the production line from the production Line list menu.
  
<br>
+
2. Select the workstation name from Workstation pull down list which is under "In Use."
  
==== WorkStation Maintenance  ====
+
3. Open the pop-up menu by right-clicking on the workstation then select '''Remove Workstation''' menu.
  
<br>
+
4. Select '''OK''' to remove the Workstation from this production line or select '''Cancel''' to exit.
  
'''Figure 15: Workstation Maintenance'''<br>
+
&nbsp;
  
[[Image:SOP-5-I-MES0024-C Workstation-Maintenance.jpg]]<br>
+
==== WorkStation Maintenance ====
  
<br>
+
&nbsp;
  
<br>
+
'''Figure 15: Workstation Maintenance'''
  
1. Select the production line from the production line list.  
+
[[File:SOP-5-I-MES0024-C Workstation-Maintenance.jpg|RTENOTITLE]]
  
2. Select the workstation from the workstation(s) list.
+
&nbsp;
  
3. Open the pop-up menu by right-clicking then select '''Workstation Maintenance''' option<font color="#00000A">.</font>
+
&nbsp;
  
<font color="#00000A">4. </font>Renaming: Fill in a new workstation name in the '''New Workstation''' field and then select '''Change '''to rename the selected workstation name.  
+
1. Select the production line from the production line list.
  
5. Equipment: Select the Equipment, then select '''Change '''to reset the Workstation type.<br>
+
2. Select the workstation from the workstation(s) list.
  
<br>  
+
3. Open the pop-up menu by right-clicking then select '''Workstation Maintenance''' option<font color="#00000A">.</font>
  
'''Figure 16: Workstation Maintenance- Detail'''  
+
<font color="#00000A">4. </font>Renaming: Fill in a new workstation name in the '''New Workstation''' field and then select '''Change '''to rename the selected workstation name.
  
[[Image:SOP-5-I-MES0024-C Workstation-Maintenance-Detail.jpg]]<br>
+
5. Equipment: Select the Equipment, then select '''Change '''to reset the Workstation type.
  
<br>
+
&nbsp;
  
<br> NOTE: The workstation can be renamed only when the production line is in "off-line" mode.
+
'''Figure 16: Workstation Maintenance- Detail'''
  
(See Set Production Off-Line)
+
[[File:SOP-5-I-MES0024-C Workstation-Maintenance-Detail.jpg|RTENOTITLE]]
  
<br>
+
&nbsp;
  
=== Workstation Sequence  ===
+
<br/> NOTE: The workstation can be renamed only when the production line is in "off-line" mode.
  
The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.
+
(See Set Production Off-Line)
  
Following is the example to redefine the workstation sequence:
+
&nbsp;
  
<br>
+
=== Workstation Sequence ===
  
'''Figure 17: Workstation Sequence in a Production Line- Before'''
+
The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.
  
[[Image:SOP-5-I-MES0024-C Workstation-Sequence-Before.jpg]]<br>
+
Following is the example to redefine the workstation sequence:
  
<br>
+
&nbsp;
  
1. Select the production line from the production Line list.
+
'''Figure 17: Workstation Sequence in a Production Line- Before'''
  
2. Select the workstation from the workstation(s) list.  
+
[[File:SOP-5-I-MES0024-C Workstation-Sequence-Before.jpg|RTENOTITLE]]
  
3. Select '''Workstation''' '''Sequence''' to shift up the Workstation process sequence.
+
&nbsp;
  
<br>
+
1. Select the production line from the production Line list.
  
'''Figure 18: Workstation Sequence in a Production Line- After'''
+
2. Select the workstation from the workstation(s) list.
  
[[Image:SOP-5-I-MES0024-C Workstation-Sequence-After.jpg]]<br>
+
3. Select '''Workstation''' '''Sequence''' to shift up the Workstation process sequence.
  
<u></u>
+
&nbsp;
  
<br>
+
'''Figure 18: Workstation Sequence in a Production Line- After'''
  
<br>
+
[[File:SOP-5-I-MES0024-C Workstation-Sequence-After.jpg|RTENOTITLE]]
  
NOTE: The workstation process sequence goes from down to up and is allowed under the '''Workstation Sequence''' option. Please move each workstation to the correct workstation process sequence if required.
+
&nbsp;
  
<br>
+
&nbsp;
  
=== Workstation Setup  ===
+
&nbsp;
  
This module allows the user to setup the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.  
+
NOTE: The workstation process sequence goes from down to up and is allowed under the '''Workstation Sequence''' option. Please move each workstation to the correct workstation process sequence if required.
  
<br>
+
&nbsp;
  
'''Figure 19: Workstation Set-Up Parameters'''
+
=== Workstation Setup ===
  
[[Image:SOP-5-I-MES0024-C Workstation-Setup-Parameters.jpg]]<br>
+
This module allows the user to setup the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.
  
<br>
+
&nbsp;
  
<br> 1. Select the production line from the production Line list.
+
'''Figure 19: Workstation Set-Up Parameters'''
  
2. Select the workstation to be set up, then right-click to open the pop-up menu.  
+
[[File:SOP-5-I-MES0024-C Workstation-Setup-Parameters.jpg|RTENOTITLE]]
  
3. Select '''Workstation Setup'''.
+
&nbsp;
  
'''Workstation Setup Parameters'''
+
<br/> 1. Select the production line from the production Line list.
  
1. '''Barcode Regulation: (Recommended)'''
+
2. Select the workstation to be set up, then right-click to open the pop-up menu.
  
Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.  
+
3. Select '''Workstation Setup'''.
  
2. '''Scanning Behavior: (Compulsory)'''  
+
'''Workstation Setup Parameters'''
 +
 
 +
1. '''Barcode Regulation: (Recommended)'''
 +
 
 +
Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.
 +
 
 +
2. '''Scanning Behavior: (Compulsory)'''
  
 
*'''Scan by Later Workstation: '''All workstation material placements can be recorded with the next Workstation(s).  
 
*'''Scan by Later Workstation: '''All workstation material placements can be recorded with the next Workstation(s).  
 
*'''Must Scan At this Workstation: '''All workstation material placements are required to be recorded at this Workstation before reach and/or scan at next Workstation(s).  
 
*'''Must Scan At this Workstation: '''All workstation material placements are required to be recorded at this Workstation before reach and/or scan at next Workstation(s).  
*'''Scan for Previous Workstation: '''All this workstation material placements will be recorded with the previous Workstation placements.
+
*'''Scan for Previous Workstation: '''All this workstation material placements will be recorded with the previous Workstation placements.  
  
3. '''Scan Board/Panel:''' '''(Compulsory)'''  
+
3. '''Scan Board/Panel:''' '''(Compulsory)'''
  
Select the Scan Board/Panel for both 1<sup>st</sup> Side and 2<sup>nd</sup> Side  
+
Select the Scan Board/Panel for both 1<sup>st</sup> Side and 2<sup>nd</sup> Side
  
 
*'''Board''': Each individual PCB board number.  
 
*'''Board''': Each individual PCB board number.  
 
*'''Panel''': Each PCB panel number.  
 
*'''Panel''': Each PCB panel number.  
*'''Serial''': Each PCB serial number.
+
*'''Serial''': Each PCB serial number.  
 +
 
 +
4. '''Scan Extra S/N: (Compulsory)'''
  
4. '''Scan Extra S/N: (Compulsory)'''  
+
Define if extra serial need to be scanned. If it is required to scan the PCB boards additional barcodes such as, the package label, select '''Yes'''. Default is '''No'''.
  
Define if extra serial need to be scanned. If it is required to scan the PCB boards additional barcodes such as, the package label, select '''Yes'''. Default is '''No'''.
+
5. '''S/N Regulation:''' '''(Required if Scan Extra S/N is Yes)'''
  
5. '''S/N Regulation:''' '''(Required if Scan Extra S/N is Yes)'''
+
Define the serial number barcode regulation.
  
Define the serial number barcode regulation.  
+
6. '''Completed MSD:''' '''(Required if MSD control is needed)'''
  
6. '''Completed MSD:''' '''(Required if MSD control is needed)'''  
+
Default is '''No'''.
  
Default is '''No'''.  
+
Note: MSD control is only applied to the&nbsp;workstation(s)&nbsp;prior reflowing process.
  
Note: MSD control is only applied to the&nbsp;workstation(s)&nbsp;prior reflowing process.
+
7. '''Scan Side''': (Required if Scan board/Panel is "Yes")
  
7. '''Scan Side''': (Required if Scan board/Panel is "Yes")  
+
Define which production side(s) need to be scanned.
  
Define which production side(s) need to be scanned.  
+
*'''1st Side''': First PCB production side or One PCB production side.  
  
*'''1st Side''': First PCB production side or One PCB production side.
+
I.e. Such as PCB
 +
<nowiki>’</nowiki>
  
I.e. Such as PCB<nowiki>’</nowiki>s TOP side production only which do only have material placements on one PCB side.  
+
s TOP side production only which do only have material placements on one PCB side.
  
*'''2nd Side''': Second PCB production side.
+
*'''2nd Side''': Second PCB production side.  
  
I.e. Such as TOP side can be called 2<sup>nd</sup> Side as it is the second production side after BOTTOM side placement finished.  
+
I.e. Such as TOP side can be called 2<sup>nd</sup> Side as it is the second production side after BOTTOM side placement finished.
  
*'''1<sup>st</sup>&amp; 2<sup>nd</sup> Side: '''Top and Bottom side.
+
*'''1<sup>st</sup>& 2<sup>nd</sup> Side: '''Top and Bottom side.  
  
I.e. Both production sides required to be scanned at the same Workstation.  
+
I.e. Both production sides required to be scanned at the same Workstation.
  
8. '''Scan Material: (Compulsory)'''  
+
8. '''Scan Material: (Compulsory)'''
  
<br>
+
&nbsp;
  
 
*Select '''Material Barcode''' (For plant which used PTS format material label that included a unique printed PTS material barcode).  
 
*Select '''Material Barcode''' (For plant which used PTS format material label that included a unique printed PTS material barcode).  
 
*Select '''SSCI P/N''' (For plant which might used standard plant approved / developed material label that included printed SSCI Part Number barcode).  
 
*Select '''SSCI P/N''' (For plant which might used standard plant approved / developed material label that included printed SSCI Part Number barcode).  
*Select '''Manufacturer P/N''' (For plant which might&nbsp;used manufacturer provided label that included printed manufacturer Part Number barcode)
+
*Select '''Manufacturer P/N''' (For plant which might&nbsp;used manufacturer provided label that included printed manufacturer Part Number barcode)  
  
9. '''Process: (Compulsory)'''  
+
9. '''Process: (Compulsory)'''
  
Select the type of process for this workstation:  
+
Select the type of process for this workstation:
  
a. '''SMT''': For SMT Machine workstation.  
+
a. '''SMT''': For SMT Machine workstation.
  
b. '''Hand Load''': For Manual process workstation.  
+
b. '''Hand Load''': For Manual process workstation.
  
c. '''AI''': For Auto Insertion workstation.  
+
c. '''AI''': For Auto Insertion workstation.
  
NOTE: Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.  
+
NOTE: Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.
  
10. '''Device ID''': (Optional)  
+
10. '''Device ID''': (Optional)
  
Enter any integer from 0 to 999 according to the SFDC setup. If the generic attribute is set for higher device numbers using the base 34 system, the device ID may go from 0 to ZZZ.  
+
Enter any integer from 0 to 999 according to the SFDC setup. If the generic attribute is set for higher device numbers using the base 34 system, the device ID may go from 0 to ZZZ.
  
11. Select '''Change''' to set up this workstation.  
+
11. Select '''Change''' to set up this workstation.
  
12. Select '''History''' to check the log for the change of setup parameters.  
+
12. Select '''History''' to check the log for the change of setup parameters.
  
=== Define Pick List ===
+
=== Define Pick List ===
  
This module allows the user to assign the early prepared/loaded SMT placement program into a Workstation under the specific Production Line.  
+
This module allows the user to assign the early prepared/loaded SMT placement program into a Workstation under the specific Production Line.
  
'''Figure 20: Select Picklist for Workstation'''  
+
'''Figure 20: Select Picklist for Workstation'''
  
[[Image:SOP-5-I-MES0024-C Select-Picklist-for-Workstation.jpg]]<br>
+
[[File:SOP-5-I-MES0024-C Select-Picklist-for-Workstation.jpg|RTENOTITLE]]
  
<br>
+
&nbsp;
  
1. Select the production line from the production Line list.  
+
1. Select the production line from the production Line list.
  
2. Select the workstation, then right-click to open the pop-up menu.  
+
2. Select the workstation, then right-click to open the pop-up menu.
  
3. Select '''Define Picklist'''.  
+
3. Select '''Define Picklist'''.
  
4. Enter the keywords for Picklist name.  
+
4. Enter the keywords for Picklist name.
  
5. Select '''Search''' to search Picklist name.  
+
5. Select '''Search''' to search Picklist name.
  
6. Select the Picklist name to view material placements with reference designator listing.  
+
6. Select the Picklist name to view material placements with reference designator listing.
  
<br>
+
&nbsp;
  
'''Figure 21: Show Picklist Option'''  
+
'''Figure 21: Show Picklist Option'''
  
[[Image:SOP-5-I-MES0024-C Show-Picklist-Option.jpg]]<br>
+
[[File:SOP-5-I-MES0024-C Show-Picklist-Option.jpg|RTENOTITLE]]
  
<br>
+
&nbsp;
  
7. Select "'''<nowiki>+</nowiki>'''" to assign the selected picklist into the Workstation.
+
7. Select "
 +
<nowiki>+</nowiki>
  
NOTE: For additional Picklist information, see the SMT Part Traceability work instruction.  
+
" to assign the selected picklist into the Workstation.
  
=== Location mapping  ===
+
NOTE: For additional Picklist information, see the SMT Part Traceability work instruction.
  
This sub-module is designed to map PTS workstation with SFDC location, so that SFDC will forward serial number information to pre-mapped PTS workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.
+
=== Location mapping ===
  
To map a PTS workstation with a SFDC location, please select the workstation of a production line, and right-click to open the pop-up menu then click on '''Location Mapping.'''
+
This sub-module is designed to map PTS workstation with SFDC location, so that SFDC will forward serial number information to pre-mapped PTS workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.
  
<br> '''Figure 22: Location Mapping Interface'''  
+
To map a PTS workstation with a SFDC location, please select the workstation of a production line, and right-click to open the pop-up menu then click on '''Location Mapping.'''
  
[[Image:SOP-5-I-MES0024-C Location-Mapping-Interface.jpg]]<br>
+
<br/> '''Figure 22: Location Mapping Interface'''
  
<br> 1. To update an existing mapping, double click on existing mapping; edit the information, then select '''Update'''.  
+
[[File:SOP-5-I-MES0024-C Location-Mapping-Interface.jpg|RTENOTITLE]]
  
2. To delete existing mapping, select '''Delete'''.  
+
<br/> 1. To update an existing mapping, double click on existing mapping; edit the information, then select '''Update'''.
  
3. To configure a new mapping, select '''Add''' and a new line will be created.  
+
2. To delete existing mapping, select '''Delete'''.
  
*MDS User ID (Mandatory): SFDC user ID at MDS. Select from the drop-down list.  
+
3. To configure a new mapping, select '''Add''' and a new line will be created.
 +
 
 +
*MES User ID (Mandatory): SFDC user ID at MES. Select from the drop-down list.  
 
*Location Name (Mandatory): Fill in SFDC location name that to be mapped with selected PTS workstation.  
 
*Location Name (Mandatory): Fill in SFDC location name that to be mapped with selected PTS workstation.  
 
*Device ID (Optional): Fill in SFDC Device ID.  
 
*Device ID (Optional): Fill in SFDC Device ID.  
*Select '''Update''' to complete the mapping or '''Cancel''' to exit.
+
*Select '''Update''' to complete the mapping or '''Cancel''' to exit.  
  
<br>
+
&nbsp;
  
=== Set Production On/Off-Line ===
+
=== Set Production On/Off-Line ===
  
==== Set Production On-Line ====
+
==== Set Production On-Line ====
  
*Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.
+
*Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.  
  
<br>
+
&nbsp;
  
'''Figure 23: Work Order Selection When Set Production On-Line'''  
+
'''Figure 23: Work Order Selection When Set Production On-Line'''
  
[[Image:SOP-5-I-MES0024-C Workorder-Selection-Production-Line.jpg]]<br>
+
[[File:SOP-5-I-MES0024-C Workorder-Selection-Production-Line.jpg|RTENOTITLE]]
  
<br>
+
&nbsp;
  
1. Select the production line to be set on line from the production Line list.  
+
1. Select the production line to be set on line from the production Line list.
  
2. Open the pop-up menu by right-clicking, and then select '''Set Production online'''.  
+
2. Open the pop-up menu by right-clicking, and then select '''Set Production online'''.
  
3. Enter a released Work Order number, if known, or Select the work order from the list by selecting '''Show'''.  
+
3. Enter a released Work Order number, if known, or Select the work order from the list by selecting '''Show'''.
  
4. Select the Work Order (you can view the BOM detail by selecting the "<nowiki>+</nowiki>" at the left).
+
4. Select the Work Order (you can view the BOM detail by selecting the "
 +
<nowiki>+</nowiki>
  
5. Select the "<nowiki>+</nowiki>" at the right to select the Work order.  
+
" at the left).
  
6. Select '''Check''' in the '''BOM/PL''' column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.
+
5. Select the "
 +
<nowiki>+</nowiki>
  
<br>
+
" at the right to select the Work order.
  
'''Figure 24: Select Work Order'''  
+
6. Select '''Check''' in the '''BOM/PL''' column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.
  
[[Image:SOP-5-I-MES0024-C Select-Workorder.jpg]]<br>
+
&nbsp;
  
<br>
+
'''Figure 24: Select Work Order'''
  
'''Figure 25: Show BOM/PL Validation'''
+
[[File:SOP-5-I-MES0024-C Select-Workorder.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Show-BOMPL-Validation.jpg]]<br>
+
&nbsp;
  
<br>
+
'''Figure 25: Show BOM/PL Validation'''
  
*'''Items that do not exist in BOM'''
+
[[File:SOP-5-I-MES0024-C Show-BOMPL-Validation.jpg|RTENOTITLE]]
  
To compare and validate all material placements in SMT placement program (i.e. PickList) that does not exist in ERP BOM.
+
&nbsp;
  
*'''Items that do not exist in PickList'''
+
*'''Items that do not exist in BOM'''  
  
To compare and validate all material placements in ERP BOM that does not exist in SMT placement program (i.e. PickList).  
+
To compare and validate all material placements in SMT placement program (i.e. PickList) that does not exist in ERP BOM.
  
7. Fill the required Work Order with associated production ECN.
+
*'''Items that do not exist in PickList'''
  
8. Select '''On-line''' to set the production line online after confirming the Work Order and ECN selection.  
+
To compare and validate all material placements in ERP BOM that does not exist in SMT placement program (i.e. PickList).
  
NOTE:
+
7. Fill the required Work Order with associated production ECN.
  
If the work order BOM components do not match the defined picklist , the user will need to follow confirmation and update accordingly.  
+
8. Select '''On-line''' to set the production line online after confirming the Work Order and ECN selection.
 +
 
 +
NOTE:
 +
 
 +
If the work order BOM components do not match the defined picklist , the user will need to follow confirmation and update accordingly.
  
 
*Confirm that the Work Order you enter/select is associated with the latest ECN.  
 
*Confirm that the Work Order you enter/select is associated with the latest ECN.  
*Confirm the Picklist defined is correct.
+
*Confirm the Picklist defined is correct.  
 +
 
 +
&nbsp;
  
<br>
+
==== Set Production Off-Line ====
  
==== Set Production Off-Line ====
+
Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.
  
Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.  
+
1. Select the production line to be set on line from the production Line list.
  
1. Select the production line to be set on line from the production Line list.  
+
2. Open the pop-up menu by right-clicking then select '''Set Production offline'''.
  
2. Open the pop-up menu by right-clicking then select '''Set Production offline'''.  
+
3. Choose '''Set Production On/Off Line''' functional module.
  
3. Choose '''Set Production On/Off Line''' functional module.  
+
4. Select '''Off Line''' to set the line offline.
  
4. Select '''Off Line''' to set the line offline.
+
&nbsp;
  
<br>
+
'''Figure 26: Setup Production Offline'''
  
'''Figure 26: Setup Production Offline'''
+
[[File:SOP-5-I-MES0024-C Setup-Production-Offline.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Setup-Production-Offline.jpg]]<br>
+
&nbsp;
  
<br>
+
=== Load All ===
  
=== Load All  ===
+
This module allows the user to load all materials to the workstation under the following conditions.
  
This module allows the user to load all materials to the workstation under the following conditions.  
+
1. Set the production line offline (do not unload materials).
  
1. Set the production line offline (do not unload materials).  
+
2. Change setting for the workstation if needed.
  
2. Change setting for the workstation if needed.  
+
3. Set the production line to online again.
  
3. Set the production line to online again.  
+
4. The user can use the "Load All" function to load all materials to the workstation.
  
4. The user can use the "Load All" function to load all materials to the workstation.  
+
NOTE: The user can only load all when not using the unload function.
  
NOTE: The user can only load all when not using the unload function.  
+
NOTE: If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.
  
NOTE: If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.
+
&nbsp;
  
<br>
+
'''Figure 27: Load All'''
  
'''Figure 27: Load All'''
+
[[File:SOP-5-I-MES0024-C Load-All.jpg|RTENOTITLE]]
  
[[Image:SOP-5-I-MES0024-C Load-All.jpg]]<br>
+
&nbsp;
  
<br>
+
1. Set the production line to to online from the Production Line list.
  
1. Set the production line to to online from the Production Line list.
+
2. Open the workstation lists by selecting the "
 +
<nowiki>+</nowiki>
  
2. Open the workstation lists by selecting the "<nowiki>+</nowiki>" at the left.  
+
" at the left.
  
3. Open the pop-up menu by right-clicking on the workstation, and then select '''Load All'''.  
+
3. Open the pop-up menu by right-clicking on the workstation, and then select '''Load All'''.
  
4. The information will display if the Load All function succeeds.  
+
4. The information will display if the Load All function succeeds.
  
5. The user can check the loaded material at the page "Load Material Report."  
+
5. The user can check the loaded material at the page "Load Material Report."
  
== Further Information ==
+
== Further Information ==
  
This completes PTS Production Setup information. For further information on a specific functional area refer to Intranet.  
+
This completes PTS Production Setup information. For further information on a specific functional area refer to Intranet.
  
SOP-5-I-PTS0010_C_R3_Production Load Material  
+
SOP-5-I-PTS0010_C_R3_Production Load Material
  
SOP-5-I-PTS0011-C_R3_PST_PRD_Production_Scan_Board  
+
SOP-5-I-PTS0011-C_R3_PST_PRD_Production_Scan_Board
  
SOP-5-I-PTS-0012-C_R3_PST_PRD_Production_Rework_Record  
+
SOP-5-I-PTS-0012-C_R3_PST_PRD_Production_Rework_Record
  
SOP-5-I-PTS0014_Define_EZ_Pick_List  
+
SOP-5-I-PTS0014_Define_EZ_Pick_List
  
 
----
 
----
  
== Document Revision History ==
+
== Document Revision History ==
  
{| width="100%" cellspacing="0" cellpadding="4" border="2"
+
{| border="2" cellpadding="4" cellspacing="0" width="100%"
 
|-
 
|-
| bgcolor="#00FFFF" | <font color="#FFFFFF">Date</font>  
+
| bgcolor="#00FFFF" | <font color="#FFFFFF">Date</font>
| bgcolor="#00FFFF" | <font color="#FFFFFF">Author</font>  
+
| bgcolor="#00FFFF" | <font color="#FFFFFF">Author</font>
| bgcolor="#00FFFF" | <font color="#FFFFFF">Title</font>  
+
| bgcolor="#00FFFF" | <font color="#FFFFFF">Title</font>
| bgcolor="#00FFFF" | <font color="#FFFFFF">Version</font>  
+
| bgcolor="#00FFFF" | <font color="#FFFFFF">Version</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Change Reference</font>
 
| bgcolor="#00FFFF" | <font color="#FFFFFF">Change Reference</font>
 
|-
 
|-
| 01/08/13  
+
| 01/08/13
| Helena Wang  
+
| Helena Wang
| Technical Writer  
+
| Technical Writer
| 1.0  
+
| 1.0
 
| Initial SO Work Instruction
 
| Initial SO Work Instruction
 
|-
 
|-
| 17/02/14  
+
| 17/02/14
| Ashley Martin  
+
| Ashley Martin
| Technical Writer  
+
| Technical Writer
| 1.0  
+
| 1.0
 
| Review and Format
 
| Review and Format
 
|-
 
|-
| 28/02/14  
+
| 28/02/14
| Elaine Fonaro  
+
| Elaine Fonaro
| Technical Writer  
+
| Technical Writer
| 1.0  
+
| 1.0
 
| Format for WIKI
 
| Format for WIKI
 
|-
 
|-
| 04/03/2016  
+
| 04/03/2016
| Elaine Fonaro  
+
| Elaine Fonaro
| Technical Writer  
+
| Technical Writer
| v 1.10  
+
| v 1.10
 
| Updated Oracle Occurrences to ERP
 
| Updated Oracle Occurrences to ERP
 
|}
 
|}

Revision as of 07:22, 10 June 2018

42Q Home > Shop Floor Control > Production Control > Production Setup
RTENOTITLE

 

 

 

PTS
PTS Production Setup
Version MES15 Portal 1.0
Work Instruction

 

This Work Instruction is 42Q's corporate standard.
This document is under revision control. The latest revision is located on Intranet.
Once printed it is an uncontrolled copy. All alterations to this work instruction require approval.
Contact the IT Global Education and Training Department to submit suggested alterations and or updates.

This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.

SFDC Production Control

As its name implies, the Shop Floor Data Collection (SFDC) system is responsible for the collection of data from the shop floor. The collected information is then stored in the Manufacturing Execution System (MES). Specifically, the real-time information collected by SFDC is utilized by Reporting and MES Web to create quality control reports. The SFDC system uses manual and automated barcode scanning to monitor and collect data for a product line or plant. Thus SFDC plays an important role in maintaining unit histories and directing product movement on the manufacturing floor.

The system provides Access Control between the modules of the application, including the functionalities of each screen. The current version has an SFDC Configuration page which provides access to all sub modules pages and its functionalities (view, add, edit, delete, print and generate output file).

General Notes

  • This Work Instruction is a basic general training guide and is not meant to teach the process flow for individual plant or department functionality. Individual 42Q sites may have minor or specific process changes that will be documented at the site level.

Assumptions

  • Availability of SMT material placement program (e.g. Fuji SMT job program) or Hand load material placement (e.g. Material items and associated reference designator under Hand load operation).
  • Serial number printed on board prior SMT and/or Hand load operation process.
  • Each SMT machine has been assigned a unique name for identification purpose. (i.e. Workstation name)

Prerequisites

1. Understand PTS terms definition from Glossary SOP-5-I-MES0044-C_RA_PTS GLOSSARY

2. Pick List has been obtained from plant engineering and uploaded into PTS, for EZ-Pick List – Refer to SOP-5-I-MES0049

Overview

This overview explains the process for production setup in PTSWEB base on the following two different production setup scenarios:

Scenario 1

Production Setup for a new (or previous built) product item on a new shop floor production line, suggested following the steps below in PTS:

1.
Convert and upload SMT Picklist into PTS.
Refer SOP-5-I-MES0049, Define EZ Pick List.
2.
Create a New Production Line.
Refer to 2.1 Create a New Production Line.
3.
Create all required Workstation(S).
Refer to 2.5.1 Create a New Workstation.
4.
Add the Workstations into the Production Line by sequence.
Refer 2.6.1 Add a Workstation into a Production Line.
5.
Define Workstation Process Sequence in a Production Line.
Refer to 2.7 Workstation Sequence.
6.
Define Workstation Parameters for each added Workstation(s).
Refer 2.8 Workstation Setup.
7.
Define Picklist for each above added Workstation(s).
Refer 2.9 Define Picklist.
8.
Define Auto-Scan Mapping. (Optional)
Refer 2.10 Location Mapping.
9.
Set Production Online.
Refer 2.11 Set Production On/Off-Line.

Scenario 2

Production Setup for a previous built production item on where previous built shop floor production line, suggested to follow the steps below in PTS:

1.
Convert and upload SMT Picklist into PTS.
Refer SOP-5-I-PTS0014, Define EZ Pick List.
2.
Define Picklist for each Workstation which corresponding to the associated Production Line.
Refer 2.9 Define Picklist.
3.
Set Production Online.
Refer 2.11 Set Production On/Off-Line.

NOTE:

This work instruction is a general training guide and is not intended to provide a shop floor production process flow for all individual plants or departments.

NOTE:

Please avoid setting up a new assembly on any existing created production line in PTS. It is recommended to have a PTS production line naming setup for one specific assembly exclusively.

Production Setup

1. To access the Production Setup page, navigate to Shop Floor Control >

Production Control.

Figure 1: Production Set-Up (PTS)

RTENOTITLE

 

 

Create a New Production Line

Figure 2: Create New Line

RTENOTITLE

 

1. Select Create Production Line.

2. Enter the new Production Line Name. (See following section for naming format suggestions).

3. Select Create to confirm addition.

Note the following naming conventions for the Production Line.

By Shop Floor Location

Format: Area Location +

Production Zone - Production Part Number - Production Process - Production Side

Area Location: F (Floor), G (Ground)

Production Zone: Floor level or zone area in production either in alpha or number format.

Production Part Number: as named.

Production Process: S (SMT), H (Hand Load)

Production Side: T (Top), B (Bottom)

Example: F2-ABC12345-S-T

Production Line for produc ABC12345 top side SMT production at 2ndfloor.

By Production Process

Format: Production Process +

Production Zone – Production Part Number – Production Side

Production Process: S (SMT), H (Hand Load)

Production Zone: Floor level or zone area in production either in alpha or number format.

Production Part Number: as named.

Production Side: T (Top), B (Bottom)

Example: S2-ABC12345-T

Production Line for produc ABC12345 top side at SMT Line/Zone 2.

Search a Production Line

Figure 3: Search Production Line

RTENOTITLE

 

1. Enter the production line name or key words in the Search Line Name field.

2. Select the line name from the list.

3. The related production line will be listed in Production Line Available text box.

NOTE: Input the first 1 or 4 key words for the line name, then the line name will display.

 

Rename Production Line

Figure 4: Rename Production Line

RTENOTITLE

 

1. Select the production line from the Production Line list.

2. Open the pop-up menu by Right-Clicking, and then select Rename Production Line.

3. Enter the New Name in "New Production Line".

4. Select Change to rename the production line.

 

Figure 5: Rename Production Line Form

RTENOTITLE

 

NOTE: Production line name can be changed only when the production line is in off-line mode.

 

Hide/Recover Production Line

Figure 6: Hide/Recover Production Line

RTENOTITLE

 

1. Select Hide/Recover Production line.

 

Figure 7: Hide a Production Line

RTENOTITLE

 

2. Select a production line (The line is in offline and visible status) then select Hide Production Line.

3. Select OK to hide the production line or Cancel to exit.

 

Figure 8: Recover a Production Line

RTENOTITLE

 

4. Select a production line (The line is in offline and hidden status) then select Recover Production Line.

5. Select OK to recover the production line or Cancel to exit.

NOTE: The online production line not allowed to be hidden. Please set the production line to "off-line" before hiding it.

Workstation

Create a New Workstation

1. Select Create Workstation from the functional option menu. (See following section for naming format suggestions).

2. Workstation Name: Enter the workstation name.

3. Select the Equipment. (This is optional)

4. Select Create to create the new workstation.

 

Figure 9: Workstation Name and Equipment

RTENOTITLE

 

NOTE: The equipment should be added first in Production >

SMT Machine part Traceability >

Machine Registry module.
Suggested naming format for Workstation

By Shop Floor Location

Format: Area Location +

Production Zone - Placement Machine

Example: F2-CP6B

Explanation: Fuji CP6B placement machine located at 2nd Floor.

By Production Process

Format: Production Process +

Line/Zone - Placement Machine

Example: S2-CP6A

Explanation: Fuji CP6A placement machine located at SMT Line 2.

By Placement machine model with associated serial number

Format: Placement machine model – Placement machine serial number

Example: CP6-SN12345

Explanation: Fuji CP6 placement machine with its own unique machine serial number SN12345.

Hide WorkStation

Figure 10: Hide Workstation

RTENOTITLE

 

1. Select Hide WorkStation.

2. Select a WorkStation (The Workstation should be at visible status)

3. Select Send to hide the WorkStation or Cancel to exit.

Recover WorkStation

Figure 11: Recover Work Station

RTENOTITLE

 

1. Select Recover WorkStation.

2. Select a WorkStation (The Workstation is at hidden status).

3. Select Send to recover the WorkStation or Cancel to exit.

 

Add WorkStation

This module allows the user to add or remove workstation(s) from production line.

Adding Workstation into a Production Line

Figure 12: Add Workstation into a Production Line

RTENOTITLE

 

1. Select the production line from the production Line list.

2. Open the pop-up menu by right-clicking on the line name then select Add Workstation menu. Select the workstation name from Workstation name pull down list to add to the specific production line.

3. Select Add to add the workstation.

 

Figure 13: Add Workstation- Set Button

RTENOTITLE

 

NOTE: The selected production line must be off-line for workstation addition or removal.

NOTE: The Workstation Name will auto-completed after entering the first 4 characters.

Removing Workstation from a Production Line

Figure 14: Remove Workstation

RTENOTITLE

 

 

1. Select the production line from the production Line list menu.

2. Select the workstation name from Workstation pull down list which is under "In Use."

3. Open the pop-up menu by right-clicking on the workstation then select Remove Workstation menu.

4. Select OK to remove the Workstation from this production line or select Cancel to exit.

 

WorkStation Maintenance

 

Figure 15: Workstation Maintenance

RTENOTITLE

 

 

1. Select the production line from the production line list.

2. Select the workstation from the workstation(s) list.

3. Open the pop-up menu by right-clicking then select Workstation Maintenance option.

4. Renaming: Fill in a new workstation name in the New Workstation field and then select Change to rename the selected workstation name.

5. Equipment: Select the Equipment, then select Change to reset the Workstation type.

 

Figure 16: Workstation Maintenance- Detail

RTENOTITLE

 


NOTE: The workstation can be renamed only when the production line is in "off-line" mode.

(See Set Production Off-Line)

 

Workstation Sequence

The purpose of this module is to redefine the proper workstation sequence for the production line if the previous setup is incorrect.

Following is the example to redefine the workstation sequence:

 

Figure 17: Workstation Sequence in a Production Line- Before

RTENOTITLE

 

1. Select the production line from the production Line list.

2. Select the workstation from the workstation(s) list.

3. Select Workstation Sequence to shift up the Workstation process sequence.

 

Figure 18: Workstation Sequence in a Production Line- After

RTENOTITLE

 

 

 

NOTE: The workstation process sequence goes from down to up and is allowed under the Workstation Sequence option. Please move each workstation to the correct workstation process sequence if required.

 

Workstation Setup

This module allows the user to setup the scanning behavior and scanning rules for each defined Workstation under the associated Production Line.

 

Figure 19: Workstation Set-Up Parameters

RTENOTITLE

 


1. Select the production line from the production Line list.

2. Select the workstation to be set up, then right-click to open the pop-up menu.

3. Select Workstation Setup.

Workstation Setup Parameters

1. Barcode Regulation: (Recommended)

Fill in "Barcode Regulation" based on the serial number mask which is applied on each PCB serial number barcode label. If blank, no serial number will be validated for all PCB serial scanning.

2. Scanning Behavior: (Compulsory)

  • Scan by Later Workstation: All workstation material placements can be recorded with the next Workstation(s).
  • Must Scan At this Workstation: All workstation material placements are required to be recorded at this Workstation before reach and/or scan at next Workstation(s).
  • Scan for Previous Workstation: All this workstation material placements will be recorded with the previous Workstation placements.

3. Scan Board/Panel: (Compulsory)

Select the Scan Board/Panel for both 1st Side and 2nd Side

  • Board: Each individual PCB board number.
  • Panel: Each PCB panel number.
  • Serial: Each PCB serial number.

4. Scan Extra S/N: (Compulsory)

Define if extra serial need to be scanned. If it is required to scan the PCB boards additional barcodes such as, the package label, select Yes. Default is No.

5. S/N Regulation: (Required if Scan Extra S/N is Yes)

Define the serial number barcode regulation.

6. Completed MSD: (Required if MSD control is needed)

Default is No.

Note: MSD control is only applied to the workstation(s) prior reflowing process.

7. Scan Side: (Required if Scan board/Panel is "Yes")

Define which production side(s) need to be scanned.

  • 1st Side: First PCB production side or One PCB production side.

I.e. Such as PCB ’

s TOP side production only which do only have material placements on one PCB side.

  • 2nd Side: Second PCB production side.

I.e. Such as TOP side can be called 2nd Side as it is the second production side after BOTTOM side placement finished.

  • 1st& 2nd Side: Top and Bottom side.

I.e. Both production sides required to be scanned at the same Workstation.

8. Scan Material: (Compulsory)

 

  • Select Material Barcode (For plant which used PTS format material label that included a unique printed PTS material barcode).
  • Select SSCI P/N (For plant which might used standard plant approved / developed material label that included printed SSCI Part Number barcode).
  • Select Manufacturer P/N (For plant which might used manufacturer provided label that included printed manufacturer Part Number barcode)

9. Process: (Compulsory)

Select the type of process for this workstation:

a. SMT: For SMT Machine workstation.

b. Hand Load: For Manual process workstation.

c. AI: For Auto Insertion workstation.

NOTE: Different setup option defines different material loading process. Refer to the Load Material work instruction for more detail.

10. Device ID: (Optional)

Enter any integer from 0 to 999 according to the SFDC setup. If the generic attribute is set for higher device numbers using the base 34 system, the device ID may go from 0 to ZZZ.

11. Select Change to set up this workstation.

12. Select History to check the log for the change of setup parameters.

Define Pick List

This module allows the user to assign the early prepared/loaded SMT placement program into a Workstation under the specific Production Line.

Figure 20: Select Picklist for Workstation

RTENOTITLE

 

1. Select the production line from the production Line list.

2. Select the workstation, then right-click to open the pop-up menu.

3. Select Define Picklist.

4. Enter the keywords for Picklist name.

5. Select Search to search Picklist name.

6. Select the Picklist name to view material placements with reference designator listing.

 

Figure 21: Show Picklist Option

RTENOTITLE

 

7. Select " +

" to assign the selected picklist into the Workstation.

NOTE: For additional Picklist information, see the SMT Part Traceability work instruction.

Location mapping

This sub-module is designed to map PTS workstation with SFDC location, so that SFDC will forward serial number information to pre-mapped PTS workstation upon board scanning, which helps to avoid duplicate board scanning and improve production efficiency.

To map a PTS workstation with a SFDC location, please select the workstation of a production line, and right-click to open the pop-up menu then click on Location Mapping.


Figure 22: Location Mapping Interface

RTENOTITLE


1. To update an existing mapping, double click on existing mapping; edit the information, then select Update.

2. To delete existing mapping, select Delete.

3. To configure a new mapping, select Add and a new line will be created.

  • MES User ID (Mandatory): SFDC user ID at MES. Select from the drop-down list.
  • Location Name (Mandatory): Fill in SFDC location name that to be mapped with selected PTS workstation.
  • Device ID (Optional): Fill in SFDC Device ID.
  • Select Update to complete the mapping or Cancel to exit.

 

Set Production On/Off-Line

Set Production On-Line

  • Once the user has the production line and workstation ready, the production line must be set to" On-Line" mode to start work order production. The user cannot load material or scan board if the production line is off.

 

Figure 23: Work Order Selection When Set Production On-Line

RTENOTITLE

 

1. Select the production line to be set on line from the production Line list.

2. Open the pop-up menu by right-clicking, and then select Set Production online.

3. Enter a released Work Order number, if known, or Select the work order from the list by selecting Show.

4. Select the Work Order (you can view the BOM detail by selecting the " +

" at the left).

5. Select the " +

" at the right to select the Work order.

6. Select Check in the BOM/PL column to verify the BOM against the defined picklist and vice versa, below two sessions, if there are unmatched items.

 

Figure 24: Select Work Order

RTENOTITLE

 

Figure 25: Show BOM/PL Validation

RTENOTITLE

 

  • Items that do not exist in BOM

To compare and validate all material placements in SMT placement program (i.e. PickList) that does not exist in ERP BOM.

  • Items that do not exist in PickList

To compare and validate all material placements in ERP BOM that does not exist in SMT placement program (i.e. PickList).

7. Fill the required Work Order with associated production ECN.

8. Select On-line to set the production line online after confirming the Work Order and ECN selection.

NOTE:

If the work order BOM components do not match the defined picklist , the user will need to follow confirmation and update accordingly.

  • Confirm that the Work Order you enter/select is associated with the latest ECN.
  • Confirm the Picklist defined is correct.

 

Set Production Off-Line

Once the work order is completed on the production line, the production line needs to be set to Off-Line mode.

1. Select the production line to be set on line from the production Line list.

2. Open the pop-up menu by right-clicking then select Set Production offline.

3. Choose Set Production On/Off Line functional module.

4. Select Off Line to set the line offline.

 

Figure 26: Setup Production Offline

RTENOTITLE

 

Load All

This module allows the user to load all materials to the workstation under the following conditions.

1. Set the production line offline (do not unload materials).

2. Change setting for the workstation if needed.

3. Set the production line to online again.

4. The user can use the "Load All" function to load all materials to the workstation.

NOTE: The user can only load all when not using the unload function.

NOTE: If some materials are invalid/expired, those materials will fail to load if using the "load all" function. All other valid materials will load successfully.

 

Figure 27: Load All

RTENOTITLE

 

1. Set the production line to to online from the Production Line list.

2. Open the workstation lists by selecting the " +

" at the left.

3. Open the pop-up menu by right-clicking on the workstation, and then select Load All.

4. The information will display if the Load All function succeeds.

5. The user can check the loaded material at the page "Load Material Report."

Further Information

This completes PTS Production Setup information. For further information on a specific functional area refer to Intranet.

SOP-5-I-PTS0010_C_R3_Production Load Material

SOP-5-I-PTS0011-C_R3_PST_PRD_Production_Scan_Board

SOP-5-I-PTS-0012-C_R3_PST_PRD_Production_Rework_Record

SOP-5-I-PTS0014_Define_EZ_Pick_List


Document Revision History

Date Author Title Version Change Reference
01/08/13 Helena Wang Technical Writer 1.0 Initial SO Work Instruction
17/02/14 Ashley Martin Technical Writer 1.0 Review and Format
28/02/14 Elaine Fonaro Technical Writer 1.0 Format for WIKI
04/03/2016 Elaine Fonaro Technical Writer v 1.10 Updated Oracle Occurrences to ERP