Difference between revisions of "SOP-42Q-MES0041 100 Traceability"
Line 1: | Line 1: | ||
− | <small>[[Cirrus]] > [[Cirrus Production|Production]] > 100% Traceability</small><br>[[Image: | + | <small>[[Cirrus]] > [[Cirrus Production|Production]] > 100% Traceability</small><br>[[Image:42Q Logo.jpg]]<br> |
<br> | <br> | ||
Line 19: | Line 19: | ||
<br> '''Figure 1: Hand Placement''' | <br> '''Figure 1: Hand Placement''' | ||
− | [[Image: | + | [[Image:SOP-5-I-MES0041-C_Hand_Placement.jpg]]<br> |
<br> <br> | <br> <br> |
Revision as of 21:07, 8 December 2016
Cirrus > Production > 100% Traceability
This edition applies to MES15 Portal 1.0 Application and all subsequent releases and modifications until otherwise indicated in new revisions.
Contents
Production
The Parts Traceability System (PTS) is one of the applications within the MES suite of tools. It was developed to meet the demands of customers to provide component level traceability as well as to provide quality controls. This system plays a very important role in automating the production lines and raising productivity as well as enforcing rigorous product quality control. It has been implemented in many plants across the globe. This application and the features it provides continue to evolve, as the changing technologies used for the SMT process equipment tools become more detailed and rich in functionality.
100% Traceability
Hand Placement
1. To access the Hand Placement page, navigate to Production > 100% Traceability > Hand placement.
Figure 1: Hand Placement
2. Choose the Production Line and Workstation, then enter the Board Barcode and select Submit. If the material is sufficient a "Successful" message will display in the right section of the Portlet. This section will also display the Scan Time, Board Barcode, and the Scanned By information.
3. If material is not sufficient an "Error-Workstation material has run out when scan!" message will display. This is because some things need to be verified before using the 100% traceability hand placement function.
NOTE:
- First, the chosen Production Line must be online. Also, users can add a Production Line and Workstation at other Portlets in PTS and then set it online.
- Second, the Part Number must set 100% Traceability at PN Extra Info page.
- In the event of an error, the user must load material of the same Part Number for scanning. The user can select the Load Material Portlet to load material to a workstation. After this the user can repeat the actions: Choose Production Line, Workstation, and input a Board Barcode for scanning. A dialog box will display. The user can choose the Old Component and New Component from the corresponding Designator.
Figure 2: Hand Placement: P/N Extra Information
Fujitrax Rework
Figure 3: Fujitrax Rework
1. Enterthe Board S/N, and Designator. The old component and lot code will display.
2. Enter the New Component and Remark.
3. Select Submit.
Document Revision History
Date | Author | Title | Version | Change Reference |
08/01/13 | Helena Wang | Technical Writer | 1.0 | Initial SO Work Instruction |
02/17/14 | Ashley Martin | Technical Writer | 1.0 | Review and Format |
02/28/14 | Elaine Fonaro | Technical Writer | 1.0 | Format for WIKI |