Difference between revisions of "SOP-42Q-MES0041 100 Traceability"

From 42Q
Jump to navigation Jump to search
(Blanked the page)
Line 1: Line 1:
== Hand Placement  ==
 
  
Navigate to the Hand Placement page ('''Production &gt; 100% Traceability &gt; Hand Placement''').<br>
 
 
[[Image:2014-01-30_11-47-33.jpg|center|500px]]Choose the Production Line and Workstation, then enter the Board Barcode and click Submit. If material is enough, then will
 
 
pop up a message:Successful,in the right section of the Portlet will show the "Scan Time", "Board Barcode", "Scanned By" info.
 
 
If material is not enough, then will pop up a message:Error-Workstation material has run out when scan! Some things need to
 
 
be verified before using 100% traceability hand placement function.
 
 
<br>
 
 
[[Image:100handboard.png|737x214px|100handboard.png]]
 
 
<br> First, The choosed Production Line must on line. Also you can Add a Production Line and Workstation by yourself at other
 
 
Portlets in PTS, then Set it on line.
 
 
Second, the Part Number must set 100 Traceability at "PN Extra Info" Portlet.<br>
 
 
[[Image:Pn.png|553x267px|Pn.png]]
 
 
<br>
 
 
<br>
 
 
<br>
 
 
When hint Error, we need to load material of the same Part Number for scanning. you can click "Load Material" Portlet to load
 
 
material to workstation. After this you can repeat the actions:Choose Production Line, workstation, and input a Board Barcode
 
 
for scannig. Then will pop up a dialog box(as Figure). Operator can choose the Old Component and New Component to the
 
 
corresponding Designator.<br>
 
 
[[Image:100handload.png|745x302px|100handload.png]]<br>
 
 
== Fujitrax Rework ==
 

Revision as of 14:53, 28 February 2014